 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "houston-silver-line-brt",
  "title": "METRORapid Silver Line: Houston's First BRT Corridor",
  "canonicalUrl": "https://1001smartcities.org/projects/houston-silver-line-brt/"
 },
 "currentRevisionId": "2026-08-20-source-dates",
 "revisions": [
  {
   "id": "2026-08-12-evidence-baseline",
   "createdAt": "2026-08-12T00:00:00Z",
   "effectiveAt": "2026-08-07",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 2 claims and 5 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence migration",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; no human review is implied by publication of this baseline."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:f0d654ed0dbfc3b9cee60caf743ccaf9c927e17cb2d9f89fe88775a5c07f64ff",
   "snapshot": {
    "asOf": "2026-08-07",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-baseline",
     "statement": "AI-assisted structural migration. The passport itself has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2020,
      "ended": null
     }
    },
    "governance": {
     "operator": "METRO (Metropolitan Transit Authority of Harris County) operates route 433; the corridor was built by the Uptown Houston District",
     "actorTypes": [
      "utility",
      "regional-government"
     ],
     "fundingModel": "mixed",
     "fundingDescription": "Uptown TIRZ property-tax increment captured by the management district plus Federal Transit Administration funds; corridor delivered with TxDOT, the City of Houston and the Houston-Galveston Area Council",
     "cost": "$192.5M",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-58407e928b0fa973",
      "field": "impact",
      "text": "found a bus had been at full capacity 11 times",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-75b6757e6ba76a12"
      ],
      "supportNote": "The Chronicle analysed more than 40 months of operation and roughly 20,000 round trips of its own accord — the only independent measurement of the corridor's use.",
      "caveat": "Read through a reprint; the original is behind the Chronicle's paywall.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The baseline passport copies the published claim and its existing source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1c0b5a22a90ac6e7",
      "field": "impact",
      "text": "Forecast: 14,850 weekday riders by 2020",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-01faef21f0da1d32"
      ],
      "supportNote": "Carries METRO's own 2015 planning forecast alongside the fiscal-year boarding counts, which is what makes the gap measurable.",
      "caveat": "The forecast is quoted by the broadcaster from METRO's planning documents rather than read from the documents themselves.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The baseline passport copies the published claim and its existing source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-01faef21f0da1d32",
      "title": "ABC13 Houston — METRO's Silver Line bus lanes in Houston's Galleria area not meeting ridership expectations",
      "url": "https://abc13.com/post/metro-silver-line-houston-galleria/14018204/",
      "publisher": {
       "name": null,
       "domain": "abc13.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-1c0b5a22a90ac6e7"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-12",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Carries the 2015 METRO planning forecast of 14,850 riders per day, the fiscal-year boarding counts (231,000 in FY2021, 255,000 in FY2022, 299,000 in FY2023), the current figure of about 1,000 riders per day, and the ~60% Galleria office occupancy context",
       "exact": false
      },
      "preservation": {
       "archiveUrl": "https://web.archive.org/web/20250725121058/https://abc13.com/post/metro-silver-line-houston-galleria/14018204/",
       "archivedAt": "2025-07-25",
       "contentHash": null,
       "status": "archive-linked"
      }
     },
     {
      "id": "src-75b6757e6ba76a12",
      "title": "Houston Chronicle (Dug Begley), via TransitTalent — Houston Metro's move to slow service on Uptown BRT raises question about future lines",
      "url": "https://www.transittalent.com/articles/index.cfm?story=Houston_Metro_BRT_Frequency_Question_4-24-2024",
      "publisher": {
       "name": null,
       "domain": "transittalent.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-58407e928b0fa973"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-12",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent analysis: $192.5M cost; funding from management-district property-tax capture plus FTA money; headway cut from 12 to 20 minutes (April 2024 board vote), with 15 minutes considered to keep the federal rapid-transit standard; daily average first broke 1,000 in January 2024; a bus was at full capacity 11 times in ~20,000 round trips over 40+ months; interim CEO Tom Jasien quoted that ridership 'is just not there'",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b6c3a94c9cbecf9c",
      "title": "Mass Transit Magazine — Houston's METRORapid Silver Line opens for service",
      "url": "https://www.masstransitmag.com/bus/article/21151461/houstons-metrorapid-silver-line-opens-for-service",
      "publisher": {
       "name": null,
       "domain": "masstransitmag.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-12",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Opening 23 August 2020; five miles, 10 stops; dedicated bus-only lanes, traffic priority signals and level boarding; construction led by the Uptown Houston District with TxDOT, the City of Houston and the Houston-Galveston Area Council; METRO operates; launch frequency every 10 minutes",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-03655f30009e8ebc",
      "title": "METRO — Route 433 Silver Line",
      "url": "https://www.ridemetro.org/riding-metro/transit-services/local-bus/route-details/433-silver-line",
      "publisher": {
       "name": null,
       "domain": "ridemetro.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-12",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator's current service data: every 20 minutes Monday–Sunday, the ten named stations, and the real-time next-bus layer (RideMETRO app, text stop ID to 697433, website tracking)",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-d751b7c4331ef2dd",
      "title": "Uptown Houston — Getting Around",
      "url": "https://uptown-houston.com/getting-around/",
      "publisher": {
       "name": null,
       "domain": "uptown-houston.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-12",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The builder district's own rider page: 'exclusive dedicated bus lanes', $1.25 fare — and a still-advertised frequency of every 10 minutes, which METRO's own route page contradicts at 20 minutes",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 2,
     "claimsMapped": 2,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 2,
     "sourcesWithPublicationDate": 0,
     "sourcesWithArchive": 1,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates",
   "createdAt": "2026-08-20T00:00:00Z",
   "effectiveAt": "2026-08-07",
   "changeType": "update",
   "summary": "Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:29a9dcc38e8fdf997a6fb9c7ed60d49ce144b0b244ebcb8881d77b6524cae2fe",
   "snapshot": {
    "asOf": "2026-08-07",
    "projectFingerprint": "sha256:b6036cc6d1a05115e49ac25b553887edd4553b6ac23248dd1f8f12bbbf383698",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2020,
      "ended": null
     }
    },
    "governance": {
     "operator": "METRO (Metropolitan Transit Authority of Harris County) operates route 433; the corridor was built by the Uptown Houston District",
     "actorTypes": [
      "utility",
      "regional-government"
     ],
     "fundingModel": "mixed",
     "fundingDescription": "Uptown TIRZ property-tax increment captured by the management district plus Federal Transit Administration funds; corridor delivered with TxDOT, the City of Houston and the Houston-Galveston Area Council",
     "cost": "$192.5M",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-58407e928b0fa973",
      "field": "impact",
      "text": "found a bus had been at full capacity 11 times",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-75b6757e6ba76a12"
      ],
      "supportNote": "The Chronicle analysed more than 40 months of operation and roughly 20,000 round trips of its own accord — the only independent measurement of the corridor's use.",
      "caveat": "Read through a reprint; the original is behind the Chronicle's paywall.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1c0b5a22a90ac6e7",
      "field": "impact",
      "text": "Forecast: 14,850 weekday riders by 2020",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-01faef21f0da1d32"
      ],
      "supportNote": "Carries METRO's own 2015 planning forecast alongside the fiscal-year boarding counts, which is what makes the gap measurable.",
      "caveat": "The forecast is quoted by the broadcaster from METRO's planning documents rather than read from the documents themselves.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-01faef21f0da1d32",
      "title": "ABC13 Houston — METRO's Silver Line bus lanes in Houston's Galleria area not meeting ridership expectations",
      "url": "https://abc13.com/post/metro-silver-line-houston-galleria/14018204/",
      "publisher": {
       "name": null,
       "domain": "abc13.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-1c0b5a22a90ac6e7"
      ],
      "temporal": {
       "publishedAt": "2023-11-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Carries the 2015 METRO planning forecast of 14,850 riders per day, the fiscal-year boarding counts (231,000 in FY2021, 255,000 in FY2022, 299,000 in FY2023), the current figure of about 1,000 riders per day, and the ~60% Galleria office occupancy context",
       "exact": false
      },
      "preservation": {
       "archiveUrl": "https://web.archive.org/web/20250725121058/https://abc13.com/post/metro-silver-line-houston-galleria/14018204/",
       "archivedAt": "2025-07-25",
       "contentHash": null,
       "status": "archive-linked"
      }
     },
     {
      "id": "src-75b6757e6ba76a12",
      "title": "Houston Chronicle (Dug Begley), via TransitTalent — Houston Metro's move to slow service on Uptown BRT raises question about future lines",
      "url": "https://www.transittalent.com/articles/index.cfm?story=Houston_Metro_BRT_Frequency_Question_4-24-2024",
      "publisher": {
       "name": null,
       "domain": "transittalent.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-58407e928b0fa973"
      ],
      "temporal": {
       "publishedAt": "2024-04-23",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent analysis: $192.5M cost; funding from management-district property-tax capture plus FTA money; headway cut from 12 to 20 minutes (April 2024 board vote), with 15 minutes considered to keep the federal rapid-transit standard; daily average first broke 1,000 in January 2024; a bus was at full capacity 11 times in ~20,000 round trips over 40+ months; interim CEO Tom Jasien quoted that ridership 'is just not there'",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b6c3a94c9cbecf9c",
      "title": "Mass Transit Magazine — Houston's METRORapid Silver Line opens for service",
      "url": "https://www.masstransitmag.com/bus/article/21151461/houstons-metrorapid-silver-line-opens-for-service",
      "publisher": {
       "name": null,
       "domain": "masstransitmag.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2020-08-24",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Opening 23 August 2020; five miles, 10 stops; dedicated bus-only lanes, traffic priority signals and level boarding; construction led by the Uptown Houston District with TxDOT, the City of Houston and the Houston-Galveston Area Council; METRO operates; launch frequency every 10 minutes",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-03655f30009e8ebc",
      "title": "METRO — Route 433 Silver Line",
      "url": "https://www.ridemetro.org/riding-metro/transit-services/local-bus/route-details/433-silver-line",
      "publisher": {
       "name": null,
       "domain": "ridemetro.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator's current service data: every 20 minutes Monday–Sunday, the ten named stations, and the real-time next-bus layer (RideMETRO app, text stop ID to 697433, website tracking)",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-d751b7c4331ef2dd",
      "title": "Uptown Houston — Getting Around",
      "url": "https://uptown-houston.com/getting-around/",
      "publisher": {
       "name": null,
       "domain": "uptown-houston.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The builder district's own rider page: 'exclusive dedicated bus lanes', $1.25 fare — and a still-advertised frequency of every 10 minutes, which METRO's own route page contradicts at 20 minutes",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 2,
     "claimsMapped": 2,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 2,
     "sourcesWithPublicationDate": 3,
     "sourcesWithArchive": 1,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}