 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "dhaka-traffic-control",
  "title": "CASE Traffic Signal Automation",
  "canonicalUrl": "https://1001smartcities.org/projects/dhaka-traffic-control/"
 },
 "currentRevisionId": "2026-10-13-editorial-decisions",
 "revisions": [
  {
   "id": "2026-10-11-baseline",
   "createdAt": "2026-10-11T21:48:42Z",
   "effectiveAt": "2026-10-11",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 13 claims and 8 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:50561a795551b09c6e523ea0415440bcafdb451ae3e0377182d92179fece3f9c",
   "snapshot": {
    "asOf": "2026-10-11",
    "projectFingerprint": "sha256:d469fcce6b9a1c8425b112a1c5b332d2f49c5ab7b464c461285373fe351ff1dd",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "cancelled",
     "outcome": "failed",
     "evidenceGrade": "media",
     "timeline": {
      "started": 2012,
      "ended": 2019
     }
    },
    "governance": {
     "operator": "Dhaka North and South City Corporations (installation) and Dhaka Metropolitan Police (operation)",
     "actorTypes": [
      "city-government",
      "national-government"
     ],
     "fundingModel": "public",
     "fundingDescription": "World Bank IDA credit (CASE project: US$62.2M plus US$35M additional financing, across all components)",
     "cost": "≈Tk112 crore (signals and intersection works, 2010–2018)",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-265463207cb2084e",
      "field": "snippet",
      "text": "World Bank-funded CASE project",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6",
       "src-9a4e384af5b3533a"
      ],
      "supportNote": "The World Bank's completion report covers the Clean Air and Sustainable Environment (CASE) project, financed by an IDA credit; The Business Standard names CASE as the project behind the automatic signals.",
      "caveat": "The World Bank money was a concessional credit to the government, not a grant.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a820434a34f0e696",
      "field": "snippet",
      "text": "put new automated signals at 29 intersections and repaired others",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6",
       "src-fa1d7f143c25d3c1"
      ],
      "supportNote": "The World Bank report counts \"new traffic signals installed at 29 intersections\" and 91 intersections with operational signals \"including newly installed and existing fixed\". New Age reports 29 new signals installed under CASE alongside timers and solar panels at 70 crossings.",
      "caveat": "The Business Standard gives a different count — 100 automatic signal systems — so counts vary by what each source includes.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-e2da0a91ec4908d7",
      "field": "snippet",
      "text": "some Tk112 crore went into lights and intersection works between 2010 and 2018",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4b97d055cde34b9e"
      ],
      "supportNote": "The Daily Star: \"Tk 112 crore funded by the WB were spent between 2010 and 2018 for repairing and installing 100 traffic lights and other intersection infrastructure.\"",
      "caveat": "The Business Standard puts the cost of the CASE signals at about Tk100 crore; the figure covers more than the 29 new signals.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1001043503b8619c",
      "field": "snippet",
      "text": "but the systems went largely unused as police kept directing traffic by hand",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4b97d055cde34b9e",
       "src-7cfcb72766bad65d",
       "src-9a4e384af5b3533a"
      ],
      "supportNote": "The Daily Star (2020) found the World Bank-funded lights \"serve only decorative purposes\" because traffic is controlled by police hand gestures; the 2022 article reports that the trial run failed and traffic police returned to manual control; The Business Standard (2025) says that except at Gulshan-2 the automatic signals are not operational anywhere.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-16fe619832091ca2",
      "field": "snippet",
      "text": "A successor semi-automatic system — funded by the two city corporations and engineered by BUET — went live at seven intersections on 30 August 2025.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-601c9c310c9b7d5a",
       "src-9f838f6628a8f2b3"
      ],
      "supportNote": "The Business Standard reports the DTCA announcement that the semi-automatic system launches at seven intersections on 30 August, \"financed by the Dhaka North and South city corporations, with technical support from Buet\". The Daily Star (March 2026) confirms the inauguration at seven intersections on 30 August 2025.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1774ebaaa8729b15",
      "field": "impact",
      "text": "The automated signals at 29 intersections went largely unused, with police continuing to direct traffic by hand.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4b97d055cde34b9e",
       "src-9a4e384af5b3533a",
       "src-fa1d7f143c25d3c1"
      ],
      "supportNote": "The Daily Star (2020) describes police hand gestures overriding the World Bank-funded lights; The Business Standard (2025) says the CASE signals are not operational except at Gulshan-2; New Age reports that police handle the signals by hand.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cb880c3fe42fe318",
      "field": "impact",
      "text": "The World Bank's completion report of September 2019 had recorded the 29 intersections as installed and operational, and a 9.5 percent increase in vehicular traffic through selected signalised intersections.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6"
      ],
      "supportNote": "The report's results table lists \"Intersections with new traffic signals installed and operational\" as 29 against a revised target of 29, and states that vehicular traffic at selected intersections with operational signals \"exceeded the target of 8 percent to reach 9.5 percent by end of project\".",
      "caveat": "This is the funder's own completion reporting, written at project close; the same report notes that the signals' performance had not stabilised and that the police were still taking them over.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-0927259ca5707cb3",
      "field": "impact",
      "text": "A Daily Star reporter who visited at least 30 intersections found the lights working at only six (January 2020).",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4b97d055cde34b9e"
      ],
      "supportNote": "The Daily Star: \"Visiting at least 30 intersections in the capital recently, this correspondent found that the lights were working only at six.\"",
      "caveat": "A reporter's site visits, not a systematic survey.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5dea86a9a1910080",
      "field": "impact",
      "text": "In February 2025 The Business Standard reported that, except at the Gulshan-2 intersection, the CASE signals were not operational anywhere, citing a government impact evaluation (IMED, 2022-23) that called the money spent a complete waste.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-9a4e384af5b3533a"
      ],
      "supportNote": "The Business Standard: \"Except for the Gulshan-2 intersection, these automatic signal systems are not operational anywhere else\", and \"The money spent on this has been a complete waste according to the IMED report\", referring to the Implementation Monitoring and Evaluation Division's Impact Evaluation Report (2022-23).",
      "caveat": "The IMED evaluation is known here only through the newspaper's account.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-11c0c2fd29b3db8d",
      "field": "impact",
      "text": "By March 2026 the city-funded successor ran at seven intersections, with 15 more still uninstalled",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-9f838f6628a8f2b3"
      ],
      "supportNote": "The Daily Star (14 March 2026): BUET's Prof Moazzem Hossain says authorities \"have failed to install signals at 15 additional intersections under the pilot project in the seven months since its inauguration\" on 30 August 2025 at seven intersections.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b5eb8a113f7de2c4",
      "field": "impact",
      "text": "in August 2026 Dhaka South City Corporation began trialling a fully automated, BUET-built system at Shahbagh",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-907a3335f4853c28"
      ],
      "supportNote": "The Daily Star (13 August 2026): \"An automated traffic signal system has been launched on a trial basis at Shahbagh intersection in Dhaka\", inaugurated by the DSCC administrator \"with technical assistance from Bangladesh University of Engineering and Technology (Buet)\".",
      "caveat": "A launch-day report; no results from the trial have been published.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5d90e2597a345114",
      "field": "lesson",
      "text": "without operator training, maintenance budgets, and integration with existing police practice, automated signals fall out of use and traffic reverts to manual control",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6",
       "src-4b97d055cde34b9e",
       "src-7cfcb72766bad65d"
      ],
      "supportNote": "The World Bank report says Dhaka Metropolitan Police \"required a significant amount of capacity building\" to manage the signals and that a fragmented mandate between city and police persisted throughout; The Daily Star (2020) quotes officials that the police lacked monitoring and maintenance capacity and a traffic inspector explaining why the automatic timings were overridden; the 2022 article reports police reverting to manual control.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-322ba08ac287c886",
      "field": "lesson",
      "text": "The World Bank counted the signals as delivered; reporters found them dark or ignored.",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6",
       "src-4b97d055cde34b9e"
      ],
      "supportNote": "The World Bank's results table records the 29 new signal intersections as achieved and \"Target achieved\"; The Daily Star found lights working at only six of at least 30 intersections and the rest overridden by police.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-3a4b58ff50a691f6",
      "title": "World Bank — CASE Project completion report (authority)",
      "url": "https://documents1.worldbank.org/curated/en/750141570130909620/pdf/Bangladesh-Clean-Air-and-Sustainable-Environment-Project.pdf",
      "publisher": {
       "name": null,
       "domain": "documents1.worldbank.org",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-265463207cb2084e",
       "clm-a820434a34f0e696",
       "clm-cb880c3fe42fe318",
       "clm-5d90e2597a345114",
       "clm-322ba08ac287c886"
      ],
      "temporal": {
       "publishedAt": "2019-09-26",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The World Bank's Implementation Completion and Results Report on the Clean Air and Sustainable Environment (CASE) project: a US$62.2 million IDA credit plus US$35 million additional financing, closed 31 March 2019. It records new traffic signals at 29 intersections and 91 intersections with operational signals, reports a 9.5 percent increase in vehicular traffic at selected signalised intersections, and describes the slow handover of the signals to Dhaka Metropolitan Police (29 intersections by 31 August 2019).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4b97d055cde34b9e",
      "title": "The Daily Star — Unutilised Traffic Lights: Money wasted, streets made dangerous (press)",
      "url": "https://www.thedailystar.net/frontpage/news/unutilised-traffic-lights-money-wasted-streets-made-dangerous-1852909",
      "publisher": {
       "name": null,
       "domain": "thedailystar.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-e2da0a91ec4908d7",
       "clm-1001043503b8619c",
       "clm-1774ebaaa8729b15",
       "clm-0927259ca5707cb3",
       "clm-5d90e2597a345114",
       "clm-322ba08ac287c886"
      ],
      "temporal": {
       "publishedAt": "2020-01-12",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports that Tk 112 crore of World Bank funding was spent between 2010 and 2018 under CASE on repairing and installing 100 traffic lights and other intersection infrastructure, that the lights were handed to Dhaka Metropolitan Police, which lacked monitoring and maintenance capacity, and that the reporter found lights working at only six of at least 30 intersections visited.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-7cfcb72766bad65d",
      "title": "The Daily Star (press)",
      "url": "https://www.thedailystar.net/news/bangladesh/news/automated-traffic-signal-money-thrown-down-the-drain-2939261",
      "publisher": {
       "name": null,
       "domain": "thedailystar.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-1001043503b8619c",
       "clm-5d90e2597a345114"
      ],
      "temporal": {
       "publishedAt": "2022-01-15",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Overview of Dhaka's signal projects since 2001: Tk 119 crore spent over 15 years; solar panels and countdown timers added at 70 crossings in 2011–2013 under a World Bank-funded project whose trial run failed, after which traffic police returned to manual control.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-fa1d7f143c25d3c1",
      "title": "New Age (press)",
      "url": "https://www.newagebd.net/article/229090/traffic-signals-inactive-despite-various-projects",
      "publisher": {
       "name": null,
       "domain": "newagebd.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-a820434a34f0e696",
       "clm-1774ebaaa8729b15"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports that the city corporations installed solar panels and countdown timers at 70 crossings and 29 new signals under the CASE project in 2012–13, that a 2014 decision to hand signal operation to Dhaka Metropolitan Police went unimplemented for years, and that police control traffic by hand.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-9a4e384af5b3533a",
      "title": "The Business Standard (press)",
      "url": "https://www.tbsnews.net/supplement/ineffective-tech-fixes-dhaka-traffic-just-waste-funds-1059451",
      "publisher": {
       "name": null,
       "domain": "tbsnews.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-265463207cb2084e",
       "clm-1001043503b8619c",
       "clm-1774ebaaa8729b15",
       "clm-5dea86a9a1910080"
      ],
      "temporal": {
       "publishedAt": "2025-02-03",
       "updatedAt": "2025-02-11",
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Says CASE ran from 2009 to 2019 under the Department of Environment, the city corporations and DTCA, and installed 100 automatic traffic signal systems for about Tk100 crore; except at Gulshan-2, none is operational. Cites the Implementation Monitoring and Evaluation Division's impact evaluation report (2022-23), which found the automatic system ineffective and the money a complete waste.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-601c9c310c9b7d5a",
      "title": "The Business Standard — Semi-automatic traffic signals to be launched at 7 Dhaka intersections tomorrow",
      "url": "https://www.tbsnews.net/bangladesh/transport/semi-automatic-traffic-signals-be-launched-7-dhaka-intersections-tomorrow",
      "publisher": {
       "name": null,
       "domain": "tbsnews.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-16fe619832091ca2"
      ],
      "temporal": {
       "publishedAt": "2025-08-29",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "DTCA press note: a semi-automatic signal system launches at seven named intersections on 30 August 2025 as a pilot within a 22-intersection High Court–Airport scheme, financed by the two city corporations with technical support from BUET.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-9f838f6628a8f2b3",
      "title": "The Daily Star — Pilot project shows promise, but delays stall wider rollout",
      "url": "https://www.thedailystar.net/news/bangladesh/news/pilot-project-shows-promise-delays-stall-wider-rollout-4128141",
      "publisher": {
       "name": null,
       "domain": "thedailystar.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-16fe619832091ca2",
       "clm-11c0c2fd29b3db8d"
      ],
      "temporal": {
       "publishedAt": "2026-03-14",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Seven months after the 30 August 2025 inauguration, traffic flows better at the seven equipped intersections but drivers still run reds; signals at the other 15 pilot intersections were not yet installed because of procurement and administrative delays (BUET's Prof Moazzem Hossain).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-907a3335f4853c28",
      "title": "The Daily Star — Automated traffic signal system debuts at Dhaka's Shahbagh",
      "url": "https://www.thedailystar.net/news/bangladesh/transport/news/automated-traffic-signal-system-debuts-dhakas-shahbagh-4246861",
      "publisher": {
       "name": null,
       "domain": "thedailystar.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b5eb8a113f7de2c4"
      ],
      "temporal": {
       "publishedAt": "2026-08-13",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Dhaka South City Corporation launches a fully automated signal system on a trial basis at Shahbagh with BUET technical support; the pilot is to cover 20 key intersections initially, with 50 more planned.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 13,
     "claimsMapped": 13,
     "sourcesTotal": 8,
     "sourcesUsedByClaims": 8,
     "sourcesWithPublicationDate": 7,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-10-13-editorial-decisions",
   "createdAt": "2026-10-13T16:19:31Z",
   "effectiveAt": "2026-10-11",
   "changeType": "reclassification",
   "summary": "Status changed from cancelled to completed: the World Bank's CASE project closed as planned in March 2019; the outcome stays failed because the signals fell out of use.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/projectState",
     "summary": "Updated projectState to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:dd1f762942095dd3b51184799e68917d2e419d03ae2e9b5667c292f0619c0944",
   "snapshot": {
    "asOf": "2026-10-11",
    "projectFingerprint": "sha256:33686607ff5187a1345af4701746147463880d9394a2f6744b4b6f3a3707aa04",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "completed",
     "outcome": "failed",
     "evidenceGrade": "media",
     "timeline": {
      "started": 2012,
      "ended": 2019
     }
    },
    "governance": {
     "operator": "Dhaka North and South City Corporations (installation) and Dhaka Metropolitan Police (operation)",
     "actorTypes": [
      "city-government",
      "national-government"
     ],
     "fundingModel": "public",
     "fundingDescription": "World Bank IDA credit (CASE project: US$62.2M plus US$35M additional financing, across all components)",
     "cost": "≈Tk112 crore (signals and intersection works, 2010–2018)",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-265463207cb2084e",
      "field": "snippet",
      "text": "World Bank-funded CASE project",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6",
       "src-9a4e384af5b3533a"
      ],
      "supportNote": "The World Bank's completion report covers the Clean Air and Sustainable Environment (CASE) project, financed by an IDA credit; The Business Standard names CASE as the project behind the automatic signals.",
      "caveat": "The World Bank money was a concessional credit to the government, not a grant.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a820434a34f0e696",
      "field": "snippet",
      "text": "put new automated signals at 29 intersections and repaired others",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6",
       "src-fa1d7f143c25d3c1"
      ],
      "supportNote": "The World Bank report counts \"new traffic signals installed at 29 intersections\" and 91 intersections with operational signals \"including newly installed and existing fixed\". New Age reports 29 new signals installed under CASE alongside timers and solar panels at 70 crossings.",
      "caveat": "The Business Standard gives a different count — 100 automatic signal systems — so counts vary by what each source includes.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-e2da0a91ec4908d7",
      "field": "snippet",
      "text": "some Tk112 crore went into lights and intersection works between 2010 and 2018",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4b97d055cde34b9e"
      ],
      "supportNote": "The Daily Star: \"Tk 112 crore funded by the WB were spent between 2010 and 2018 for repairing and installing 100 traffic lights and other intersection infrastructure.\"",
      "caveat": "The Business Standard puts the cost of the CASE signals at about Tk100 crore; the figure covers more than the 29 new signals.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1001043503b8619c",
      "field": "snippet",
      "text": "but the systems went largely unused as police kept directing traffic by hand",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4b97d055cde34b9e",
       "src-7cfcb72766bad65d",
       "src-9a4e384af5b3533a"
      ],
      "supportNote": "The Daily Star (2020) found the World Bank-funded lights \"serve only decorative purposes\" because traffic is controlled by police hand gestures; the 2022 article reports that the trial run failed and traffic police returned to manual control; The Business Standard (2025) says that except at Gulshan-2 the automatic signals are not operational anywhere.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-16fe619832091ca2",
      "field": "snippet",
      "text": "A successor semi-automatic system — funded by the two city corporations and engineered by BUET — went live at seven intersections on 30 August 2025.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-601c9c310c9b7d5a",
       "src-9f838f6628a8f2b3"
      ],
      "supportNote": "The Business Standard reports the DTCA announcement that the semi-automatic system launches at seven intersections on 30 August, \"financed by the Dhaka North and South city corporations, with technical support from Buet\". The Daily Star (March 2026) confirms the inauguration at seven intersections on 30 August 2025.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1774ebaaa8729b15",
      "field": "impact",
      "text": "The automated signals at 29 intersections went largely unused, with police continuing to direct traffic by hand.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4b97d055cde34b9e",
       "src-9a4e384af5b3533a",
       "src-fa1d7f143c25d3c1"
      ],
      "supportNote": "The Daily Star (2020) describes police hand gestures overriding the World Bank-funded lights; The Business Standard (2025) says the CASE signals are not operational except at Gulshan-2; New Age reports that police handle the signals by hand.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cb880c3fe42fe318",
      "field": "impact",
      "text": "The World Bank's completion report of September 2019 had recorded the 29 intersections as installed and operational, and a 9.5 percent increase in vehicular traffic through selected signalised intersections.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6"
      ],
      "supportNote": "The report's results table lists \"Intersections with new traffic signals installed and operational\" as 29 against a revised target of 29, and states that vehicular traffic at selected intersections with operational signals \"exceeded the target of 8 percent to reach 9.5 percent by end of project\".",
      "caveat": "This is the funder's own completion reporting, written at project close; the same report notes that the signals' performance had not stabilised and that the police were still taking them over.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-0927259ca5707cb3",
      "field": "impact",
      "text": "A Daily Star reporter who visited at least 30 intersections found the lights working at only six (January 2020).",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4b97d055cde34b9e"
      ],
      "supportNote": "The Daily Star: \"Visiting at least 30 intersections in the capital recently, this correspondent found that the lights were working only at six.\"",
      "caveat": "A reporter's site visits, not a systematic survey.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5dea86a9a1910080",
      "field": "impact",
      "text": "In February 2025 The Business Standard reported that, except at the Gulshan-2 intersection, the CASE signals were not operational anywhere, citing a government impact evaluation (IMED, 2022-23) that called the money spent a complete waste.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-9a4e384af5b3533a"
      ],
      "supportNote": "The Business Standard: \"Except for the Gulshan-2 intersection, these automatic signal systems are not operational anywhere else\", and \"The money spent on this has been a complete waste according to the IMED report\", referring to the Implementation Monitoring and Evaluation Division's Impact Evaluation Report (2022-23).",
      "caveat": "The IMED evaluation is known here only through the newspaper's account.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-11c0c2fd29b3db8d",
      "field": "impact",
      "text": "By March 2026 the city-funded successor ran at seven intersections, with 15 more still uninstalled",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-9f838f6628a8f2b3"
      ],
      "supportNote": "The Daily Star (14 March 2026): BUET's Prof Moazzem Hossain says authorities \"have failed to install signals at 15 additional intersections under the pilot project in the seven months since its inauguration\" on 30 August 2025 at seven intersections.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b5eb8a113f7de2c4",
      "field": "impact",
      "text": "in August 2026 Dhaka South City Corporation began trialling a fully automated, BUET-built system at Shahbagh",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-907a3335f4853c28"
      ],
      "supportNote": "The Daily Star (13 August 2026): \"An automated traffic signal system has been launched on a trial basis at Shahbagh intersection in Dhaka\", inaugurated by the DSCC administrator \"with technical assistance from Bangladesh University of Engineering and Technology (Buet)\".",
      "caveat": "A launch-day report; no results from the trial have been published.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5d90e2597a345114",
      "field": "lesson",
      "text": "without operator training, maintenance budgets, and integration with existing police practice, automated signals fall out of use and traffic reverts to manual control",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6",
       "src-4b97d055cde34b9e",
       "src-7cfcb72766bad65d"
      ],
      "supportNote": "The World Bank report says Dhaka Metropolitan Police \"required a significant amount of capacity building\" to manage the signals and that a fragmented mandate between city and police persisted throughout; The Daily Star (2020) quotes officials that the police lacked monitoring and maintenance capacity and a traffic inspector explaining why the automatic timings were overridden; the 2022 article reports police reverting to manual control.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-322ba08ac287c886",
      "field": "lesson",
      "text": "The World Bank counted the signals as delivered; reporters found them dark or ignored.",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3a4b58ff50a691f6",
       "src-4b97d055cde34b9e"
      ],
      "supportNote": "The World Bank's results table records the 29 new signal intersections as achieved and \"Target achieved\"; The Daily Star found lights working at only six of at least 30 intersections and the rest overridden by police.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-3a4b58ff50a691f6",
      "title": "World Bank — CASE Project completion report (authority)",
      "url": "https://documents1.worldbank.org/curated/en/750141570130909620/pdf/Bangladesh-Clean-Air-and-Sustainable-Environment-Project.pdf",
      "publisher": {
       "name": null,
       "domain": "documents1.worldbank.org",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-265463207cb2084e",
       "clm-a820434a34f0e696",
       "clm-cb880c3fe42fe318",
       "clm-5d90e2597a345114",
       "clm-322ba08ac287c886"
      ],
      "temporal": {
       "publishedAt": "2019-09-26",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The World Bank's Implementation Completion and Results Report on the Clean Air and Sustainable Environment (CASE) project: a US$62.2 million IDA credit plus US$35 million additional financing, closed 31 March 2019. It records new traffic signals at 29 intersections and 91 intersections with operational signals, reports a 9.5 percent increase in vehicular traffic at selected signalised intersections, and describes the slow handover of the signals to Dhaka Metropolitan Police (29 intersections by 31 August 2019).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4b97d055cde34b9e",
      "title": "The Daily Star — Unutilised Traffic Lights: Money wasted, streets made dangerous (press)",
      "url": "https://www.thedailystar.net/frontpage/news/unutilised-traffic-lights-money-wasted-streets-made-dangerous-1852909",
      "publisher": {
       "name": null,
       "domain": "thedailystar.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-e2da0a91ec4908d7",
       "clm-1001043503b8619c",
       "clm-1774ebaaa8729b15",
       "clm-0927259ca5707cb3",
       "clm-5d90e2597a345114",
       "clm-322ba08ac287c886"
      ],
      "temporal": {
       "publishedAt": "2020-01-12",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports that Tk 112 crore of World Bank funding was spent between 2010 and 2018 under CASE on repairing and installing 100 traffic lights and other intersection infrastructure, that the lights were handed to Dhaka Metropolitan Police, which lacked monitoring and maintenance capacity, and that the reporter found lights working at only six of at least 30 intersections visited.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-7cfcb72766bad65d",
      "title": "The Daily Star (press)",
      "url": "https://www.thedailystar.net/news/bangladesh/news/automated-traffic-signal-money-thrown-down-the-drain-2939261",
      "publisher": {
       "name": null,
       "domain": "thedailystar.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-1001043503b8619c",
       "clm-5d90e2597a345114"
      ],
      "temporal": {
       "publishedAt": "2022-01-15",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Overview of Dhaka's signal projects since 2001: Tk 119 crore spent over 15 years; solar panels and countdown timers added at 70 crossings in 2011–2013 under a World Bank-funded project whose trial run failed, after which traffic police returned to manual control.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-fa1d7f143c25d3c1",
      "title": "New Age (press)",
      "url": "https://www.newagebd.net/article/229090/traffic-signals-inactive-despite-various-projects",
      "publisher": {
       "name": null,
       "domain": "newagebd.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-a820434a34f0e696",
       "clm-1774ebaaa8729b15"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports that the city corporations installed solar panels and countdown timers at 70 crossings and 29 new signals under the CASE project in 2012–13, that a 2014 decision to hand signal operation to Dhaka Metropolitan Police went unimplemented for years, and that police control traffic by hand.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-9a4e384af5b3533a",
      "title": "The Business Standard (press)",
      "url": "https://www.tbsnews.net/supplement/ineffective-tech-fixes-dhaka-traffic-just-waste-funds-1059451",
      "publisher": {
       "name": null,
       "domain": "tbsnews.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-265463207cb2084e",
       "clm-1001043503b8619c",
       "clm-1774ebaaa8729b15",
       "clm-5dea86a9a1910080"
      ],
      "temporal": {
       "publishedAt": "2025-02-03",
       "updatedAt": "2025-02-11",
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Says CASE ran from 2009 to 2019 under the Department of Environment, the city corporations and DTCA, and installed 100 automatic traffic signal systems for about Tk100 crore; except at Gulshan-2, none is operational. Cites the Implementation Monitoring and Evaluation Division's impact evaluation report (2022-23), which found the automatic system ineffective and the money a complete waste.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-601c9c310c9b7d5a",
      "title": "The Business Standard — Semi-automatic traffic signals to be launched at 7 Dhaka intersections tomorrow",
      "url": "https://www.tbsnews.net/bangladesh/transport/semi-automatic-traffic-signals-be-launched-7-dhaka-intersections-tomorrow",
      "publisher": {
       "name": null,
       "domain": "tbsnews.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-16fe619832091ca2"
      ],
      "temporal": {
       "publishedAt": "2025-08-29",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "DTCA press note: a semi-automatic signal system launches at seven named intersections on 30 August 2025 as a pilot within a 22-intersection High Court–Airport scheme, financed by the two city corporations with technical support from BUET.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-9f838f6628a8f2b3",
      "title": "The Daily Star — Pilot project shows promise, but delays stall wider rollout",
      "url": "https://www.thedailystar.net/news/bangladesh/news/pilot-project-shows-promise-delays-stall-wider-rollout-4128141",
      "publisher": {
       "name": null,
       "domain": "thedailystar.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-16fe619832091ca2",
       "clm-11c0c2fd29b3db8d"
      ],
      "temporal": {
       "publishedAt": "2026-03-14",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Seven months after the 30 August 2025 inauguration, traffic flows better at the seven equipped intersections but drivers still run reds; signals at the other 15 pilot intersections were not yet installed because of procurement and administrative delays (BUET's Prof Moazzem Hossain).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-907a3335f4853c28",
      "title": "The Daily Star — Automated traffic signal system debuts at Dhaka's Shahbagh",
      "url": "https://www.thedailystar.net/news/bangladesh/transport/news/automated-traffic-signal-system-debuts-dhakas-shahbagh-4246861",
      "publisher": {
       "name": null,
       "domain": "thedailystar.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b5eb8a113f7de2c4"
      ],
      "temporal": {
       "publishedAt": "2026-08-13",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Dhaka South City Corporation launches a fully automated signal system on a trial basis at Shahbagh with BUET technical support; the pilot is to cover 20 key intersections initially, with 50 more planned.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 13,
     "claimsMapped": 13,
     "sourcesTotal": 8,
     "sourcesUsedByClaims": 8,
     "sourcesWithPublicationDate": 7,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}