 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "delhi-ev-policy-charging",
  "title": "Delhi EV Policy & Discom-Tendered Public Charging",
  "canonicalUrl": "https://1001smartcities.org/projects/delhi-ev-policy-charging/"
 },
 "currentRevisionId": "2026-08-27-editorial-review",
 "revisions": [
  {
   "id": "2026-08-28-baseline",
   "createdAt": "2026-08-27T00:50:50Z",
   "effectiveAt": "2026-07-26",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 10 claims and 6 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:d4e4553b765a4e85e8e027c6fc4997b9205f55506d07cfdadae3696a9c60167a",
   "snapshot": {
    "asOf": "2026-07-26",
    "projectFingerprint": "sha256:1a111bb9feed89a0d197ad7ab2e4fd59f9d187fd7fbc94019e787db24ba1fb37",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "completed",
     "outcome": "scaled-back",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2020,
      "ended": 2026
     }
    },
    "governance": {
     "operator": "Transport Department / State EV Cell, Government of NCT of Delhi, with Delhi Transco Limited and the distribution companies BRPL, BYPL and Tata Power-DDL",
     "actorTypes": [
      "city-government",
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-25235b1e4c2c22d3",
      "field": "snippet",
      "text": "the government pooled about 100 public land parcels from the metro, the bus corporation and other agencies and awarded them on the lowest service charge to drivers rather than the highest revenue to the state, producing public charging at roughly 2 rupees a unit across some 900 points from late 2022",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0"
      ],
      "supportNote": "The OECD case study: the government aggregated land parcels from the Delhi Metro Rail Corporation, Delhi Transport Corporation and other agencies; it kept the service charge for the end consumer as the bidding criterion rather than revenue maximisation; the result was 900 charging points at 100 locations at 2 rupees per unit, with about 20 sites live in October 2022 and all 100 expected live by December 2022.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-61ae14de7e0f8d54",
      "field": "snippet",
      "text": "The policy's own target was 25 percent of new vehicle registrations electric by 2024; penetration was about 12 percent when the tender was written and 12.6 percent of new sales in FY2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0",
       "src-b4d613e24e1982cf"
      ],
      "supportNote": "The OECD case study, January 2023: the target of 25% of all new vehicles registered by 2024 to be EVs, with EVs having penetrated approximately 12% of the vehicle market in Delhi at that point. pv magazine India, July 2026: EV penetration stood at 12.6% of new vehicle sales in FY2026.",
      "caveat": "The two figures are not stated on identical bases: the case study speaks of penetration of the vehicle market, pv magazine of a share of new vehicle sales.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f174e48a8b62264d",
      "field": "snippet",
      "text": "The policy lapsed in August 2023 and was extended repeatedly",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-dd2ba5b86de812f4"
      ],
      "supportNote": "The Tribune: the policy was launched in 2020, officially lapsed in August 2023, and has since been extended several times — most recently to 31 March 2026 or until a new policy is approved, whichever is earlier.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3d03f60557360887",
      "field": "snippet",
      "text": "with about 140 crore rupees of promised subsidies unpaid until a High Court order in September 2025",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42958e2ca021c833"
      ],
      "supportNote": "Outlook Business, carrying PTI: the Delhi government will begin clearing pending EV subsidy dues of about Rs 140 crore, a backlog accumulated over two years, after the High Court on 3 September 2025 ordered immediate steps to disburse the promised subsidies.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5f3710736e62ff13",
      "field": "snippet",
      "text": "A successor policy took effect on 1 July 2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-b4d613e24e1982cf"
      ],
      "supportNote": "pv magazine India: the Delhi EV Policy 2026 is effective from 1 July 2026 to 31 March 2030, backed by an estimated INR 15,000 crore in incentives and tax exemptions.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1fe26b092cf0f8e0",
      "field": "impact",
      "text": "bidding on the service charge drove quotes negative and left public charging at about 2 rupees a unit across 900 points at 100 sites",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0"
      ],
      "supportNote": "The OECD case study: the combination of attractive aggregated land and a viable business model produced strong competition, the government received negative service charge bids, and users can charge at just 2 rupees per unit — across 900 charging points at 100 locations.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f6a6c1d94234df27",
      "field": "impact",
      "text": "8,849 public charging points and 893 battery-swapping stations by the end of 2025, against an assessed requirement of 36,150 points and 1,500 stations",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d6df29b2410ee844"
      ],
      "supportNote": "ThePrint, 19 January 2026, quoting official data: Delhi has 8,849 charging points against a total requirement of 36,150, and 893 battery-swapping stations as of 31 December 2025 against a requirement of 1,500.",
      "caveat": "Both the stock and the requirement are Delhi government figures relayed by the press; the basis of the 36,150 assessment has not been published.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d8feb03b4b684c1c",
      "field": "impact",
      "text": "EVs were about 12 percent of Delhi's vehicle market by the case study's account in January 2023 and 12.6 percent of new vehicle sales in FY2026, against a 25 percent target for 2024",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0",
       "src-b4d613e24e1982cf"
      ],
      "supportNote": "The OECD case study of January 2023 states approximately 12% penetration of the Delhi vehicle market and the 25% target for 2024; pv magazine India of July 2026 states 12.6% of new vehicle sales in FY2026.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-edc2c1b431bd7922",
      "field": "lesson",
      "text": "the state removed the two costs that usually kill a charging business by aggregating the land itself and paying for the upstream electrical connection",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0"
      ],
      "supportNote": "The OECD case study: the government took responsibility for putting together land parcels from different agencies to be rented on a concessional basis, defrayed the costs of upstream electrical infrastructure on each site, and linked lease rentals to revenue — addressing two major costs that impede the business viability of charging stations.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b6456dc67e838592",
      "field": "lesson",
      "text": "the subsidy meant to pull buyers across went unpaid for two years — because, on the government's own account, a chief minister's arrest meant the cabinet did not meet to extend the policy in time, and a court had to say that procedural hurdles are not a pretext for withholding money already promised",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42958e2ca021c833"
      ],
      "supportNote": "Outlook Business: the backlog had accumulated over two years; a senior official attributed the delay to the arrest of the former chief minister, in whose absence the cabinet meeting was not held and the policy could not be extended on time; and the High Court said procedural hurdles cannot be used as a pretext to delay payments, adding that the government cannot hide behind the absence of a disbursement timeline in the 2020 policy.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8cbd8b79d4daf893",
      "title": "Transport Department, Government of NCT of Delhi — Delhi EV Policy",
      "url": "https://transport.delhi.gov.in/transport/delhi-ev-policy",
      "publisher": {
       "name": null,
       "domain": "transport.delhi.gov.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-28",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The policy's own page. It answered every automated request with HTTP 503 in this pass, so nothing in this entry rests on it alone; the policy's 25 percent target for 2024 is quoted instead from the OECD case study. Undated.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-a3bc81dbc40a00d0",
      "title": "OECD Observatory of Public Sector Innovation — Delhi's model of EV charging infrastructure",
      "url": "https://oecd-opsi.org/innovations/delhis-model-of-ev-charging-infrastructure-ensuring-the-cheapest-ev-charging-rates-in-the-world/",
      "publisher": {
       "name": null,
       "domain": "oecd-opsi.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-25235b1e4c2c22d3",
       "clm-61ae14de7e0f8d54",
       "clm-1fe26b092cf0f8e0",
       "clm-d8feb03b4b684c1c",
       "clm-edc2c1b431bd7922"
      ],
      "temporal": {
       "publishedAt": "2023-01-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-28",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study (25 Jan 2023) of the Delhi Transco tender: land aggregation from DMRC and DTC, lease linked to utilisation, service charge as the bidding criterion, ~900 points at 100 locations, 2 rupees per unit. The 'cheapest in the world' framing is the submitting body's own.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-d6df29b2410ee844",
      "title": "ThePrint — Delhi govt to add 7,000 EV charging points, 100 swapping stations this year",
      "url": "https://theprint.in/india/delhi-govt-to-add-7000-ev-charging-points-100-swapping-stations-this-year-to-curb-pollution/2831255/",
      "publisher": {
       "name": null,
       "domain": "theprint.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-f6a6c1d94234df27"
      ],
      "temporal": {
       "publishedAt": "2026-01-19",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-28",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "19 Jan 2026, Delhi government figures: 8,849 charging points and 893 battery-swapping stations against a requirement of 36,150 points.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b4d613e24e1982cf",
      "title": "pv magazine India — Can Delhi's new EV policy deliver 95% EV registrations by 2027?",
      "url": "https://www.pv-magazine-india.com/2026/07/02/can-delhis-new-ev-policy-deliver-95-ev-registrations-by-2027/",
      "publisher": {
       "name": null,
       "domain": "pv-magazine-india.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-61ae14de7e0f8d54",
       "clm-5f3710736e62ff13",
       "clm-d8feb03b4b684c1c"
      ],
      "temporal": {
       "publishedAt": "2026-07-02",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-28",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "2 Jul 2026: EV penetration 12.6% of new sales in FY2026; successor policy runs 1 Jul 2026 to 31 Mar 2030.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-dd2ba5b86de812f4",
      "title": "The Tribune — Govt extends EV policy till March 2026",
      "url": "https://www.tribuneindia.com/news/delhi/govt-extends-ev-policy-till-march-2026",
      "publisher": {
       "name": null,
       "domain": "tribuneindia.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-f174e48a8b62264d"
      ],
      "temporal": {
       "publishedAt": "2025-07-22",
       "updatedAt": "2025-07-23",
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-28",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "22 Jul 2025 cabinet decision; confirms the policy lapsed in August 2023 and has been extended several times pending a replacement.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-42958e2ca021c833",
      "title": "Outlook Business — Delhi to clear 140 crore rupees pending EV subsidy dues after High Court rap",
      "url": "https://www.outlookbusiness.com/industry/delhi-to-clear-140-crore-pending-ev-subsidy-dues-after-hc-rap",
      "publisher": {
       "name": null,
       "domain": "outlookbusiness.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3d03f60557360887",
       "clm-b6456dc67e838592"
      ],
      "temporal": {
       "publishedAt": "2025-09-16",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-28",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Delhi High Court order of 3 Sep 2025 on a two-year subsidy backlog; about 140 crore rupees pending, 177 crore disbursed through 2023.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 6,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 5,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-27-source-dating",
   "createdAt": "2026-08-27T13:37:00Z",
   "effectiveAt": "2026-07-26",
   "changeType": "correction",
   "summary": "Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:faee1177315c6ab7d7d3923f398906a57e1961ea0fcd2142ce5378c7e1385621",
   "snapshot": {
    "asOf": "2026-07-26",
    "projectFingerprint": "sha256:abb757b78c5e240b836b9ef8e1c5bfffcf86ba4cb97c211ae0141841bdb7b989",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "completed",
     "outcome": "scaled-back",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2020,
      "ended": 2026
     }
    },
    "governance": {
     "operator": "Transport Department / State EV Cell, Government of NCT of Delhi, with Delhi Transco Limited and the distribution companies BRPL, BYPL and Tata Power-DDL",
     "actorTypes": [
      "city-government",
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-25235b1e4c2c22d3",
      "field": "snippet",
      "text": "the government pooled about 100 public land parcels from the metro, the bus corporation and other agencies and awarded them on the lowest service charge to drivers rather than the highest revenue to the state, producing public charging at roughly 2 rupees a unit across some 900 points from late 2022",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0"
      ],
      "supportNote": "The OECD case study: the government aggregated land parcels from the Delhi Metro Rail Corporation, Delhi Transport Corporation and other agencies; it kept the service charge for the end consumer as the bidding criterion rather than revenue maximisation; the result was 900 charging points at 100 locations at 2 rupees per unit, with about 20 sites live in October 2022 and all 100 expected live by December 2022.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-61ae14de7e0f8d54",
      "field": "snippet",
      "text": "The policy's own target was 25 percent of new vehicle registrations electric by 2024; penetration was about 12 percent when the tender was written and 12.6 percent of new sales in FY2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0",
       "src-b4d613e24e1982cf"
      ],
      "supportNote": "The OECD case study, January 2023: the target of 25% of all new vehicles registered by 2024 to be EVs, with EVs having penetrated approximately 12% of the vehicle market in Delhi at that point. pv magazine India, July 2026: EV penetration stood at 12.6% of new vehicle sales in FY2026.",
      "caveat": "The two figures are not stated on identical bases: the case study speaks of penetration of the vehicle market, pv magazine of a share of new vehicle sales.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f174e48a8b62264d",
      "field": "snippet",
      "text": "The policy lapsed in August 2023 and was extended repeatedly",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-dd2ba5b86de812f4"
      ],
      "supportNote": "The Tribune: the policy was launched in 2020, officially lapsed in August 2023, and has since been extended several times — most recently to 31 March 2026 or until a new policy is approved, whichever is earlier.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3d03f60557360887",
      "field": "snippet",
      "text": "with about 140 crore rupees of promised subsidies unpaid until a High Court order in September 2025",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42958e2ca021c833"
      ],
      "supportNote": "Outlook Business, carrying PTI: the Delhi government will begin clearing pending EV subsidy dues of about Rs 140 crore, a backlog accumulated over two years, after the High Court on 3 September 2025 ordered immediate steps to disburse the promised subsidies.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5f3710736e62ff13",
      "field": "snippet",
      "text": "A successor policy took effect on 1 July 2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-b4d613e24e1982cf"
      ],
      "supportNote": "pv magazine India: the Delhi EV Policy 2026 is effective from 1 July 2026 to 31 March 2030, backed by an estimated INR 15,000 crore in incentives and tax exemptions.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1fe26b092cf0f8e0",
      "field": "impact",
      "text": "bidding on the service charge drove quotes negative and left public charging at about 2 rupees a unit across 900 points at 100 sites",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0"
      ],
      "supportNote": "The OECD case study: the combination of attractive aggregated land and a viable business model produced strong competition, the government received negative service charge bids, and users can charge at just 2 rupees per unit — across 900 charging points at 100 locations.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f6a6c1d94234df27",
      "field": "impact",
      "text": "8,849 public charging points and 893 battery-swapping stations by the end of 2025, against an assessed requirement of 36,150 points and 1,500 stations",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d6df29b2410ee844"
      ],
      "supportNote": "ThePrint, 19 January 2026, quoting official data: Delhi has 8,849 charging points against a total requirement of 36,150, and 893 battery-swapping stations as of 31 December 2025 against a requirement of 1,500.",
      "caveat": "Both the stock and the requirement are Delhi government figures relayed by the press; the basis of the 36,150 assessment has not been published.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d8feb03b4b684c1c",
      "field": "impact",
      "text": "EVs were about 12 percent of Delhi's vehicle market by the case study's account in January 2023 and 12.6 percent of new vehicle sales in FY2026, against a 25 percent target for 2024",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0",
       "src-b4d613e24e1982cf"
      ],
      "supportNote": "The OECD case study of January 2023 states approximately 12% penetration of the Delhi vehicle market and the 25% target for 2024; pv magazine India of July 2026 states 12.6% of new vehicle sales in FY2026.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-edc2c1b431bd7922",
      "field": "lesson",
      "text": "the state removed the two costs that usually kill a charging business by aggregating the land itself and paying for the upstream electrical connection",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0"
      ],
      "supportNote": "The OECD case study: the government took responsibility for putting together land parcels from different agencies to be rented on a concessional basis, defrayed the costs of upstream electrical infrastructure on each site, and linked lease rentals to revenue — addressing two major costs that impede the business viability of charging stations.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b6456dc67e838592",
      "field": "lesson",
      "text": "the subsidy meant to pull buyers across went unpaid for two years — because, on the government's own account, a chief minister's arrest meant the cabinet did not meet to extend the policy in time, and a court had to say that procedural hurdles are not a pretext for withholding money already promised",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42958e2ca021c833"
      ],
      "supportNote": "Outlook Business: the backlog had accumulated over two years; a senior official attributed the delay to the arrest of the former chief minister, in whose absence the cabinet meeting was not held and the policy could not be extended on time; and the High Court said procedural hurdles cannot be used as a pretext to delay payments, adding that the government cannot hide behind the absence of a disbursement timeline in the 2020 policy.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8cbd8b79d4daf893",
      "title": "Transport Department, Government of NCT of Delhi — Delhi EV Policy",
      "url": "https://transport.delhi.gov.in/transport/delhi-ev-policy",
      "publisher": {
       "name": null,
       "domain": "transport.delhi.gov.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The policy's own page. It answered every automated request with HTTP 503 in this pass, so nothing in this entry rests on it alone; the policy's 25 percent target for 2024 is quoted instead from the OECD case study. Undated.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-a3bc81dbc40a00d0",
      "title": "OECD Observatory of Public Sector Innovation — Delhi's model of EV charging infrastructure",
      "url": "https://oecd-opsi.org/innovations/delhis-model-of-ev-charging-infrastructure-ensuring-the-cheapest-ev-charging-rates-in-the-world/",
      "publisher": {
       "name": null,
       "domain": "oecd-opsi.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-25235b1e4c2c22d3",
       "clm-61ae14de7e0f8d54",
       "clm-1fe26b092cf0f8e0",
       "clm-d8feb03b4b684c1c",
       "clm-edc2c1b431bd7922"
      ],
      "temporal": {
       "publishedAt": "2023-01-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study (25 Jan 2023) of the Delhi Transco tender: land aggregation from DMRC and DTC, lease linked to utilisation, service charge as the bidding criterion, ~900 points at 100 locations, 2 rupees per unit. The 'cheapest in the world' framing is the submitting body's own.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-d6df29b2410ee844",
      "title": "ThePrint — Delhi govt to add 7,000 EV charging points, 100 swapping stations this year",
      "url": "https://theprint.in/india/delhi-govt-to-add-7000-ev-charging-points-100-swapping-stations-this-year-to-curb-pollution/2831255/",
      "publisher": {
       "name": null,
       "domain": "theprint.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-f6a6c1d94234df27"
      ],
      "temporal": {
       "publishedAt": "2026-01-19",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "19 Jan 2026, Delhi government figures: 8,849 charging points and 893 battery-swapping stations against a requirement of 36,150 points.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b4d613e24e1982cf",
      "title": "pv magazine India — Can Delhi's new EV policy deliver 95% EV registrations by 2027?",
      "url": "https://www.pv-magazine-india.com/2026/07/02/can-delhis-new-ev-policy-deliver-95-ev-registrations-by-2027/",
      "publisher": {
       "name": null,
       "domain": "pv-magazine-india.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-61ae14de7e0f8d54",
       "clm-5f3710736e62ff13",
       "clm-d8feb03b4b684c1c"
      ],
      "temporal": {
       "publishedAt": "2026-07-02",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "2 Jul 2026: EV penetration 12.6% of new sales in FY2026; successor policy runs 1 Jul 2026 to 31 Mar 2030.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-dd2ba5b86de812f4",
      "title": "The Tribune — Govt extends EV policy till March 2026",
      "url": "https://www.tribuneindia.com/news/delhi/govt-extends-ev-policy-till-march-2026",
      "publisher": {
       "name": null,
       "domain": "tribuneindia.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-f174e48a8b62264d"
      ],
      "temporal": {
       "publishedAt": "2025-07-23",
       "updatedAt": "2025-07-23",
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "22 Jul 2025 cabinet decision; confirms the policy lapsed in August 2023 and has been extended several times pending a replacement.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-42958e2ca021c833",
      "title": "Outlook Business — Delhi to clear 140 crore rupees pending EV subsidy dues after High Court rap",
      "url": "https://www.outlookbusiness.com/industry/delhi-to-clear-140-crore-pending-ev-subsidy-dues-after-hc-rap",
      "publisher": {
       "name": null,
       "domain": "outlookbusiness.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3d03f60557360887",
       "clm-b6456dc67e838592"
      ],
      "temporal": {
       "publishedAt": "2025-09-16",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Delhi High Court order of 3 Sep 2025 on a two-year subsidy backlog; about 140 crore rupees pending, 177 crore disbursed through 2023.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 6,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 5,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-27-editorial-review",
   "createdAt": "2026-08-27T13:54:00Z",
   "effectiveAt": "2026-07-26",
   "changeType": "correction",
   "summary": "Rewrite a source note that told the reader how the page answered a request instead of what it carries.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:4a169487a089866c8ba9a118b52146fe400ef9d2bb3289c15f8a85ad09078c8a",
   "snapshot": {
    "asOf": "2026-07-26",
    "projectFingerprint": "sha256:2231f0873e69b54fea2d0b00a756d142b1adc446442b8cedc4dab402ea0874c5",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "completed",
     "outcome": "scaled-back",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2020,
      "ended": 2026
     }
    },
    "governance": {
     "operator": "Transport Department / State EV Cell, Government of NCT of Delhi, with Delhi Transco Limited and the distribution companies BRPL, BYPL and Tata Power-DDL",
     "actorTypes": [
      "city-government",
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-25235b1e4c2c22d3",
      "field": "snippet",
      "text": "the government pooled about 100 public land parcels from the metro, the bus corporation and other agencies and awarded them on the lowest service charge to drivers rather than the highest revenue to the state, producing public charging at roughly 2 rupees a unit across some 900 points from late 2022",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0"
      ],
      "supportNote": "The OECD case study: the government aggregated land parcels from the Delhi Metro Rail Corporation, Delhi Transport Corporation and other agencies; it kept the service charge for the end consumer as the bidding criterion rather than revenue maximisation; the result was 900 charging points at 100 locations at 2 rupees per unit, with about 20 sites live in October 2022 and all 100 expected live by December 2022.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-61ae14de7e0f8d54",
      "field": "snippet",
      "text": "The policy's own target was 25 percent of new vehicle registrations electric by 2024; penetration was about 12 percent when the tender was written and 12.6 percent of new sales in FY2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0",
       "src-b4d613e24e1982cf"
      ],
      "supportNote": "The OECD case study, January 2023: the target of 25% of all new vehicles registered by 2024 to be EVs, with EVs having penetrated approximately 12% of the vehicle market in Delhi at that point. pv magazine India, July 2026: EV penetration stood at 12.6% of new vehicle sales in FY2026.",
      "caveat": "The two figures are not stated on identical bases: the case study speaks of penetration of the vehicle market, pv magazine of a share of new vehicle sales.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f174e48a8b62264d",
      "field": "snippet",
      "text": "The policy lapsed in August 2023 and was extended repeatedly",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-dd2ba5b86de812f4"
      ],
      "supportNote": "The Tribune: the policy was launched in 2020, officially lapsed in August 2023, and has since been extended several times — most recently to 31 March 2026 or until a new policy is approved, whichever is earlier.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3d03f60557360887",
      "field": "snippet",
      "text": "with about 140 crore rupees of promised subsidies unpaid until a High Court order in September 2025",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42958e2ca021c833"
      ],
      "supportNote": "Outlook Business, carrying PTI: the Delhi government will begin clearing pending EV subsidy dues of about Rs 140 crore, a backlog accumulated over two years, after the High Court on 3 September 2025 ordered immediate steps to disburse the promised subsidies.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5f3710736e62ff13",
      "field": "snippet",
      "text": "A successor policy took effect on 1 July 2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-b4d613e24e1982cf"
      ],
      "supportNote": "pv magazine India: the Delhi EV Policy 2026 is effective from 1 July 2026 to 31 March 2030, backed by an estimated INR 15,000 crore in incentives and tax exemptions.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1fe26b092cf0f8e0",
      "field": "impact",
      "text": "bidding on the service charge drove quotes negative and left public charging at about 2 rupees a unit across 900 points at 100 sites",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0"
      ],
      "supportNote": "The OECD case study: the combination of attractive aggregated land and a viable business model produced strong competition, the government received negative service charge bids, and users can charge at just 2 rupees per unit — across 900 charging points at 100 locations.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f6a6c1d94234df27",
      "field": "impact",
      "text": "8,849 public charging points and 893 battery-swapping stations by the end of 2025, against an assessed requirement of 36,150 points and 1,500 stations",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d6df29b2410ee844"
      ],
      "supportNote": "ThePrint, 19 January 2026, quoting official data: Delhi has 8,849 charging points against a total requirement of 36,150, and 893 battery-swapping stations as of 31 December 2025 against a requirement of 1,500.",
      "caveat": "Both the stock and the requirement are Delhi government figures relayed by the press; the basis of the 36,150 assessment has not been published.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d8feb03b4b684c1c",
      "field": "impact",
      "text": "EVs were about 12 percent of Delhi's vehicle market by the case study's account in January 2023 and 12.6 percent of new vehicle sales in FY2026, against a 25 percent target for 2024",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0",
       "src-b4d613e24e1982cf"
      ],
      "supportNote": "The OECD case study of January 2023 states approximately 12% penetration of the Delhi vehicle market and the 25% target for 2024; pv magazine India of July 2026 states 12.6% of new vehicle sales in FY2026.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-edc2c1b431bd7922",
      "field": "lesson",
      "text": "the state removed the two costs that usually kill a charging business by aggregating the land itself and paying for the upstream electrical connection",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3bc81dbc40a00d0"
      ],
      "supportNote": "The OECD case study: the government took responsibility for putting together land parcels from different agencies to be rented on a concessional basis, defrayed the costs of upstream electrical infrastructure on each site, and linked lease rentals to revenue — addressing two major costs that impede the business viability of charging stations.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b6456dc67e838592",
      "field": "lesson",
      "text": "the subsidy meant to pull buyers across went unpaid for two years — because, on the government's own account, a chief minister's arrest meant the cabinet did not meet to extend the policy in time, and a court had to say that procedural hurdles are not a pretext for withholding money already promised",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42958e2ca021c833"
      ],
      "supportNote": "Outlook Business: the backlog had accumulated over two years; a senior official attributed the delay to the arrest of the former chief minister, in whose absence the cabinet meeting was not held and the policy could not be extended on time; and the High Court said procedural hurdles cannot be used as a pretext to delay payments, adding that the government cannot hide behind the absence of a disbursement timeline in the 2020 policy.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8cbd8b79d4daf893",
      "title": "Transport Department, Government of NCT of Delhi — Delhi EV Policy",
      "url": "https://transport.delhi.gov.in/transport/delhi-ev-policy",
      "publisher": {
       "name": null,
       "domain": "transport.delhi.gov.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The policy's own page. Nothing in this entry rests on it alone: the 25 per cent target for 2024 is quoted instead from the OECD case study cited beside it. No publication date is recorded for the page.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-a3bc81dbc40a00d0",
      "title": "OECD Observatory of Public Sector Innovation — Delhi's model of EV charging infrastructure",
      "url": "https://oecd-opsi.org/innovations/delhis-model-of-ev-charging-infrastructure-ensuring-the-cheapest-ev-charging-rates-in-the-world/",
      "publisher": {
       "name": null,
       "domain": "oecd-opsi.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-25235b1e4c2c22d3",
       "clm-61ae14de7e0f8d54",
       "clm-1fe26b092cf0f8e0",
       "clm-d8feb03b4b684c1c",
       "clm-edc2c1b431bd7922"
      ],
      "temporal": {
       "publishedAt": "2023-01-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study (25 Jan 2023) of the Delhi Transco tender: land aggregation from DMRC and DTC, lease linked to utilisation, service charge as the bidding criterion, ~900 points at 100 locations, 2 rupees per unit. The 'cheapest in the world' framing is the submitting body's own.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-d6df29b2410ee844",
      "title": "ThePrint — Delhi govt to add 7,000 EV charging points, 100 swapping stations this year",
      "url": "https://theprint.in/india/delhi-govt-to-add-7000-ev-charging-points-100-swapping-stations-this-year-to-curb-pollution/2831255/",
      "publisher": {
       "name": null,
       "domain": "theprint.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-f6a6c1d94234df27"
      ],
      "temporal": {
       "publishedAt": "2026-01-19",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "19 Jan 2026, Delhi government figures: 8,849 charging points and 893 battery-swapping stations against a requirement of 36,150 points.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b4d613e24e1982cf",
      "title": "pv magazine India — Can Delhi's new EV policy deliver 95% EV registrations by 2027?",
      "url": "https://www.pv-magazine-india.com/2026/07/02/can-delhis-new-ev-policy-deliver-95-ev-registrations-by-2027/",
      "publisher": {
       "name": null,
       "domain": "pv-magazine-india.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-61ae14de7e0f8d54",
       "clm-5f3710736e62ff13",
       "clm-d8feb03b4b684c1c"
      ],
      "temporal": {
       "publishedAt": "2026-07-02",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "2 Jul 2026: EV penetration 12.6% of new sales in FY2026; successor policy runs 1 Jul 2026 to 31 Mar 2030.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-dd2ba5b86de812f4",
      "title": "The Tribune — Govt extends EV policy till March 2026",
      "url": "https://www.tribuneindia.com/news/delhi/govt-extends-ev-policy-till-march-2026",
      "publisher": {
       "name": null,
       "domain": "tribuneindia.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-f174e48a8b62264d"
      ],
      "temporal": {
       "publishedAt": "2025-07-23",
       "updatedAt": "2025-07-23",
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "22 Jul 2025 cabinet decision; confirms the policy lapsed in August 2023 and has been extended several times pending a replacement.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-42958e2ca021c833",
      "title": "Outlook Business — Delhi to clear 140 crore rupees pending EV subsidy dues after High Court rap",
      "url": "https://www.outlookbusiness.com/industry/delhi-to-clear-140-crore-pending-ev-subsidy-dues-after-hc-rap",
      "publisher": {
       "name": null,
       "domain": "outlookbusiness.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3d03f60557360887",
       "clm-b6456dc67e838592"
      ],
      "temporal": {
       "publishedAt": "2025-09-16",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Delhi High Court order of 3 Sep 2025 on a two-year subsidy backlog; about 140 crore rupees pending, 177 crore disbursed through 2023.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 6,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 5,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}