{
 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "atlanta-smart-water-meters",
  "title": "Smart Water Meter Rollout",
  "canonicalUrl": "https://1001smartcities.org/projects/atlanta-smart-water-meters/"
 },
 "currentRevisionId": "2026-10-13-editorial-decisions",
 "revisions": [
  {
   "id": "2026-10-11-baseline",
   "createdAt": "2026-10-11T21:50:19Z",
   "effectiveAt": "2026-10-11",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 14 claims and 7 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:42287917958b9b2d679a390fedbfed5d0a3d4fd9242afdaef51014c8ff9ca83b",
   "snapshot": {
    "asOf": "2026-10-11",
    "projectFingerprint": "sha256:d6d5451bb6005e77adf530b897d67aac42aad097990e9d22674cf30c5ddc7f12",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "construction",
     "outcome": "ongoing",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2025,
      "ended": null
     }
    },
    "governance": {
     "operator": "City of Atlanta Department of Watershed Management",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "utility",
     "fundingDescription": "Not published for the meter rollout; the department is funded from the city's Water & Wastewater Revenue enterprise fund",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-36020331ece08e1c",
      "field": "snippet",
      "text": "announced in 2025 a six-year, citywide replacement of its aging meter fleet",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e"
      ],
      "supportNote": "In July 2025 the commissioner said the department is beginning a six-year rollout of upgraded smart meters, replacing a 15-year-old metering system.",
      "caveat": "No source after July 2025 reports meters actually being installed; in September 2026 the switch was still described as a long-term plan.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b02bbf1d97c74e8b",
      "field": "snippet",
      "text": "meant to give roughly 174,000 accounts a smart meter that reports usage in near real time",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e"
      ],
      "supportNote": "The commissioner said about 174,000 accounts are on the system and that the new meters give customers real-time access to their usage.",
      "caveat": "The article does not say every account will receive a new meter; the city auditor counted over 177,000 active accounts in April 2026.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-af97bb2099468a40",
      "field": "snippet",
      "text": "instead of relying on manual or estimated readings",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e",
       "src-42c1700b964b238e"
      ],
      "supportNote": "The commissioner says broken meters lead to estimated reads; the auditor describes readings taken electronically or manually when automated meters fail, and estimated when neither works.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5f268ebc0ff148b8",
      "field": "snippet",
      "text": "The rollout follows years of billing disputes and lawsuits over inflated 'estimated' bills from broken meters",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e",
       "src-c82e1edab35caea0"
      ],
      "supportNote": "FOX 5 reports customers denied adjustments who sued and won; the 2013 audit describes estimated bills as a long-standing cause of disputes and a dispute process streamlined after customer lawsuits.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d2e2bb2e5fdb54f3",
      "field": "snippet",
      "text": "runs alongside Mayor Andre Dickens' $2 billion, 20-year water-infrastructure plan announced in 2025",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f4fa5f23b4350f17",
       "src-99b07c26edf4e00e"
      ],
      "supportNote": "GPB reports the March 2025 announcement of an estimated $2 billion over 20 years to replace pipes and other water assets; FOX 5 mentions it next to the meter rollout.",
      "caveat": "No source says the meter rollout is funded from or part of the $2 billion programme.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-efff4c3d8a222664",
      "field": "snippet",
      "text": "no independent measurement of leak-detection or billing-accuracy gains has yet been published",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42c1700b964b238e"
      ],
      "supportNote": "The City Auditor's August 2026 follow-up says the department has not reported progress toward implementing the 2023 recommendations, including the one on meter infrastructure; no evaluation of new meters exists.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-4cb9221f8402e208",
      "field": "lesson",
      "text": "A billing crisis born from broken meters is to be fixed with meters again",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e",
       "src-c82e1edab35caea0"
      ],
      "supportNote": "The 2013 audit documents the earlier automated-meter rollout from 2006; FOX 5 reports the new rollout as the answer to estimated bills from broken meters.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-701320c6fc21003b",
      "field": "lesson",
      "text": "the city has not yet published evidence it also reduces real water loss",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42c1700b964b238e"
      ],
      "supportNote": "No city report evaluates the new meters; the 2026 follow-up records no reported progress on the meter recommendation.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5324435e13b0c379",
      "field": "lesson",
      "text": "the radio-read meters it began installing in 2006 cut estimated bills from 10% of billings in 2008 and 2009 to 1% in 2012, according to the City Auditor",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-c82e1edab35caea0"
      ],
      "supportNote": "The 2013 audit: automated reads were 96% of bills in the first half of 2012, estimated and forced reads 1%, down from 10% in 2008 and 2009.",
      "caveat": "The 2013 audit adds that disputes and meter-check requests stayed fairly stable despite the drop.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3b1d939ba6a16ddc",
      "field": "lesson",
      "text": "by May 2023 8.81% of accounts were billed on estimates, against an industry median of 0.1%",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-611fb29d6bdeb05f"
      ],
      "supportNote": "The 2023 audit: in May 2023 the department billed 170,798 accounts, 15,047 (8.81%) on estimates; the AWWA benchmarking survey median for 2020 was 0.1%.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-8a84392b7951e6ea",
      "field": "lesson",
      "text": "which the auditor tied to too few field staff and a backlog of meter repair work orders",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-611fb29d6bdeb05f"
      ],
      "supportNote": "The auditor writes that the increase in estimated reads may be due to insufficient field staff and a backlog of unresolved meter investigation and repair work orders.",
      "caveat": "The auditor says 'may be due to'; management replied that new technology, not more staff, is the answer.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-50337688a69da721",
      "field": "lesson",
      "text": "in May 2023 the then commissioner said all meters would be replaced in a minimum of three years",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-6b4a3bf61390ac6e"
      ],
      "supportNote": "FOX 5 reports Commissioner Mikita Browning announcing smart meters to replace existing technology, with replacing all meters estimated to take a minimum of three years.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c42db7f9e86d7c05",
      "field": "lesson",
      "text": "in September 2026 the switch to smart meters was still described as a long-term plan",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-18ecf64a8aa609de"
      ],
      "supportNote": "WSB-TV's report of 30 September 2026 closes: long-term plans call for transitioning the city water network to automated smart meters.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-dd4fc7e717b61103",
      "field": "lesson",
      "text": "New meters fix estimated bills only for as long as someone repairs them.",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-c82e1edab35caea0",
       "src-611fb29d6bdeb05f"
      ],
      "supportNote": "The 2013 audit shows estimates falling to 1% after automation; the 2023 audit shows them back at 8.75% with repair backlogs.",
      "caveat": "Editorial conclusion drawn from the two audits.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-99b07c26edf4e00e",
      "title": "FOX 5 Atlanta, \"Atlanta's new watershed commissioner vows to tackle sky-high water bills with modern solutions\"",
      "url": "https://www.fox5atlanta.com/news/atlantas-new-watershed-commissioner-vows-tackle-sky-high-water-bills-modern-solutions",
      "publisher": {
       "name": null,
       "domain": "fox5atlanta.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-36020331ece08e1c",
       "clm-b02bbf1d97c74e8b",
       "clm-af97bb2099468a40",
       "clm-5f268ebc0ff148b8",
       "clm-d2e2bb2e5fdb54f3",
       "clm-4cb9221f8402e208"
      ],
      "temporal": {
       "publishedAt": "2025-07-08",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Interview with Commissioner Greg Eyerly: estimated reads result from broken meters; about 174,000 accounts are on the system; the department is beginning a six-year rollout of upgraded smart meters giving customers real-time access to their usage, replacing a 15-year-old metering system; two customers who were denied adjustments by the appeals board sued the city and won; mentions the mayor's $2 billion, 20-year water investment announced earlier in the year.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-6b4a3bf61390ac6e",
      "title": "FOX 5 Atlanta — Atlanta Water makes wholesale replacement of water meters (May 2023)",
      "url": "https://www.fox5atlanta.com/news/atlanta-water-wholesale-replacement-meters",
      "publisher": {
       "name": null,
       "domain": "fox5atlanta.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-50337688a69da721"
      ],
      "temporal": {
       "publishedAt": "2023-05-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Then-commissioner Mikita Browning announces that new 'smart' meters will replace existing technology so that usage and leaks can be read remotely; a council member recalls meters installed the wrong way in the previous wholesale replacement; replacing all meters estimated to take a minimum of three years.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-611fb29d6bdeb05f",
      "title": "Atlanta City Auditor — Performance Audit: Water Billing and Collections (December 2023)",
      "url": "https://www.atlaudit.org/water-billing--collections---december-2023.html",
      "publisher": {
       "name": null,
       "domain": "atlaudit.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3b1d939ba6a16ddc",
       "clm-8a84392b7951e6ea",
       "clm-dd4fc7e717b61103"
      ],
      "temporal": {
       "publishedAt": "2023-12-07",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "City Auditor's performance audit: the monthly bill estimation rate rose from a median of about 3.6% in 2020 to 8.75% as of May 2023 (15,047 of 170,798 accounts, 8.81%, estimated in May 2023) against an AWWA benchmark median of 0.1%; likely causes are insufficient field staff and a backlog of meter investigation and repair work orders; management replies that it is piloting replacement of faulty meters with new technology, expanding citywide over time, with an estimated implementation date of December 2029.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-42c1700b964b238e",
      "title": "Atlanta City Auditor — Water Billing and Collections Follow-Up (August 2026)",
      "url": "https://www.atlaudit.org/department-of-watershed-management-water-billing-and-collections-follow-up---august-2026.html",
      "publisher": {
       "name": null,
       "domain": "atlaudit.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-af97bb2099468a40",
       "clm-efff4c3d8a222664",
       "clm-701320c6fc21003b"
      ],
      "temporal": {
       "publishedAt": "2026-08-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Follow-up audit on collections: delinquent balance grew from $198 million to $236 million on 60,168 accounts by April 2026; the department billed over 177,000 active accounts in April 2026; readings come from automated meters or manually when they fail; the department says it is addressing the 2023 recommendations but has not reported progress toward implementing them.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-c82e1edab35caea0",
      "title": "Atlanta City Auditor — Water Meter Reading, Estimates and Adjusted Billings (May 2013)",
      "url": "https://www.atlaudit.org/water-meter-readings-estimates-and-adjusted-billings-may-2013.html",
      "publisher": {
       "name": null,
       "domain": "atlaudit.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-5f268ebc0ff148b8",
       "clm-4cb9221f8402e208",
       "clm-5324435e13b0c379",
       "clm-dd4fc7e717b61103"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Earlier audit: automated meter reading, installed from 2006, accounted for 96% of bills in the first half of 2012; estimated and forced reads were 1%, down from 10% in 2008 and 2009; disputes and meter-check requests stayed fairly stable; the department's own evaluation found only one-third of small meters met all standards.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-18ecf64a8aa609de",
      "title": "WSB-TV — City addresses thousands of late water accounts (30 Sep 2026)",
      "url": "https://www.wsbtv.com/news/local/city-addresses-thousands-late-water-accounts/27B5FTFSV5FC7JRSUVT4SD45HY/",
      "publisher": {
       "name": null,
       "domain": "wsbtv.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c42db7f9e86d7c05"
      ],
      "temporal": {
       "publishedAt": "2026-09-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports the department's collections push after the 2026 audit and closes: long-term plans call for transitioning the city water network to automated smart meters that record real-time usage and detect leaks immediately.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f4fa5f23b4350f17",
      "title": "GPB News — Atlanta mayor announces 20-year plan to repair and replace city's water infrastructure",
      "url": "https://www.gpb.org/news/2025/03/20/atlanta-mayor-announces-20-year-plan-repair-and-replace-citys-water-infrastructure",
      "publisher": {
       "name": null,
       "domain": "gpb.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d2e2bb2e5fdb54f3"
      ],
      "temporal": {
       "publishedAt": "2025-03-20",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-11",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Mayor Dickens commits an estimated $2 billion over 20 years to replace pipes and other water assets, the Atlanta Drinking Water Renewal and Replacement Program; the article does not mention meters.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 14,
     "claimsMapped": 14,
     "sourcesTotal": 7,
     "sourcesUsedByClaims": 7,
     "sourcesWithPublicationDate": 6,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-10-13-editorial-decisions",
   "createdAt": "2026-10-13T16:19:44Z",
   "effectiveAt": "2026-10-11",
   "changeType": "reclassification",
   "summary": "Status changed from construction to planning: no source read shows the smart-meter replacement has begun; in September 2026 it was still described as a long-term plan.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/projectState",
     "summary": "Updated projectState to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:ef0b4a71bc90b92d7547ce3aa1d9b3eb2b3b7e5f31c3ba33d0c8cf2a1a03811b",
   "snapshot": {
    "asOf": "2026-10-11",
    "projectFingerprint": "sha256:0511c806fac520cbd583df6e2c05a3b49759d7744ccbedc1cd70e214a043a347",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "planning",
     "outcome": "ongoing",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2025,
      "ended": null
     }
    },
    "governance": {
     "operator": "City of Atlanta Department of Watershed Management",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "utility",
     "fundingDescription": "Not published for the meter rollout; the department is funded from the city's Water & Wastewater Revenue enterprise fund",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-36020331ece08e1c",
      "field": "snippet",
      "text": "announced in 2025 a six-year, citywide replacement of its aging meter fleet",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e"
      ],
      "supportNote": "In July 2025 the commissioner said the department is beginning a six-year rollout of upgraded smart meters, replacing a 15-year-old metering system.",
      "caveat": "No source after July 2025 reports meters actually being installed; in September 2026 the switch was still described as a long-term plan.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b02bbf1d97c74e8b",
      "field": "snippet",
      "text": "meant to give roughly 174,000 accounts a smart meter that reports usage in near real time",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e"
      ],
      "supportNote": "The commissioner said about 174,000 accounts are on the system and that the new meters give customers real-time access to their usage.",
      "caveat": "The article does not say every account will receive a new meter; the city auditor counted over 177,000 active accounts in April 2026.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-af97bb2099468a40",
      "field": "snippet",
      "text": "instead of relying on manual or estimated readings",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e",
       "src-42c1700b964b238e"
      ],
      "supportNote": "The commissioner says broken meters lead to estimated reads; the auditor describes readings taken electronically or manually when automated meters fail, and estimated when neither works.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5f268ebc0ff148b8",
      "field": "snippet",
      "text": "The rollout follows years of billing disputes and lawsuits over inflated 'estimated' bills from broken meters",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e",
       "src-c82e1edab35caea0"
      ],
      "supportNote": "FOX 5 reports customers denied adjustments who sued and won; the 2013 audit describes estimated bills as a long-standing cause of disputes and a dispute process streamlined after customer lawsuits.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d2e2bb2e5fdb54f3",
      "field": "snippet",
      "text": "runs alongside Mayor Andre Dickens' $2 billion, 20-year water-infrastructure plan announced in 2025",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f4fa5f23b4350f17",
       "src-99b07c26edf4e00e"
      ],
      "supportNote": "GPB reports the March 2025 announcement of an estimated $2 billion over 20 years to replace pipes and other water assets; FOX 5 mentions it next to the meter rollout.",
      "caveat": "No source says the meter rollout is funded from or part of the $2 billion programme.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-efff4c3d8a222664",
      "field": "snippet",
      "text": "no independent measurement of leak-detection or billing-accuracy gains has yet been published",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42c1700b964b238e"
      ],
      "supportNote": "The City Auditor's August 2026 follow-up says the department has not reported progress toward implementing the 2023 recommendations, including the one on meter infrastructure; no evaluation of new meters exists.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-4cb9221f8402e208",
      "field": "lesson",
      "text": "A billing crisis born from broken meters is to be fixed with meters again",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-99b07c26edf4e00e",
       "src-c82e1edab35caea0"
      ],
      "supportNote": "The 2013 audit documents the earlier automated-meter rollout from 2006; FOX 5 reports the new rollout as the answer to estimated bills from broken meters.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-701320c6fc21003b",
      "field": "lesson",
      "text": "the city has not yet published evidence it also reduces real water loss",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-42c1700b964b238e"
      ],
      "supportNote": "No city report evaluates the new meters; the 2026 follow-up records no reported progress on the meter recommendation.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5324435e13b0c379",
      "field": "lesson",
      "text": "the radio-read meters it began installing in 2006 cut estimated bills from 10% of billings in 2008 and 2009 to 1% in 2012, according to the City Auditor",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-c82e1edab35caea0"
      ],
      "supportNote": "The 2013 audit: automated reads were 96% of bills in the first half of 2012, estimated and forced reads 1%, down from 10% in 2008 and 2009.",
      "caveat": "The 2013 audit adds that disputes and meter-check requests stayed fairly stable despite the drop.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3b1d939ba6a16ddc",
      "field": "lesson",
      "text": "by May 2023 8.81% of accounts were billed on estimates, against an industry median of 0.1%",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-611fb29d6bdeb05f"
      ],
      "supportNote": "The 2023 audit: in May 2023 the department billed 170,798 accounts, 15,047 (8.81%) on estimates; the AWWA benchmarking survey median for 2020 was 0.1%.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-8a84392b7951e6ea",
      "field": "lesson",
      "text": "which the auditor tied to too few field staff and a backlog of meter repair work orders",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-611fb29d6bdeb05f"
      ],
      "supportNote": "The auditor writes that the increase in estimated reads may be due to insufficient field staff and a backlog of unresolved meter investigation and repair work orders.",
      "caveat": "The auditor says 'may be due to'; management replied that new technology, not more staff, is the answer.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-50337688a69da721",
      "field": "lesson",
      "text": "in May 2023 the then commissioner said all meters would be replaced in a minimum of three years",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-6b4a3bf61390ac6e"
      ],
      "supportNote": "FOX 5 reports Commissioner Mikita Browning announcing smart meters to replace existing technology, with replacing all meters estimated to take a minimum of three years.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c42db7f9e86d7c05",
      "field": "lesson",
      "text": "in September 2026 the switch to smart meters was still described as a long-term plan",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-18ecf64a8aa609de"
      ],
      "supportNote": "WSB-TV's report of 30 September 2026 closes: long-term plans call for transitioning the city water network to automated smart meters.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-dd4fc7e717b61103",
      "field": "lesson",
      "text": "New meters fix estimated bills only for as long as someone repairs them.",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-c82e1edab35caea0",
       "src-611fb29d6bdeb05f"
      ],
      "supportNote": "The 2013 audit shows estimates falling to 1% after automation; the 2023 audit shows them back at 8.75% with repair backlogs.",
      "caveat": "Editorial conclusion drawn from the two audits.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-99b07c26edf4e00e",
      "title": "FOX 5 Atlanta, \"Atlanta's new watershed commissioner vows to tackle sky-high water bills with modern solutions\"",
      "url": "https://www.fox5atlanta.com/news/atlantas-new-watershed-commissioner-vows-tackle-sky-high-water-bills-modern-solutions",
      "publisher": {
       "name": null,
       "domain": "fox5atlanta.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-36020331ece08e1c",
       "clm-b02bbf1d97c74e8b",
       "clm-af97bb2099468a40",
       "clm-5f268ebc0ff148b8",
       "clm-d2e2bb2e5fdb54f3",
       "clm-4cb9221f8402e208"
      ],
      "temporal": {
       "publishedAt": "2025-07-08",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Interview with Commissioner Greg Eyerly: estimated reads result from broken meters; about 174,000 accounts are on the system; the department is beginning a six-year rollout of upgraded smart meters giving customers real-time access to their usage, replacing a 15-year-old metering system; two customers who were denied adjustments by the appeals board sued the city and won; mentions the mayor's $2 billion, 20-year water investment announced earlier in the year.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-6b4a3bf61390ac6e",
      "title": "FOX 5 Atlanta — Atlanta Water makes wholesale replacement of water meters (May 2023)",
      "url": "https://www.fox5atlanta.com/news/atlanta-water-wholesale-replacement-meters",
      "publisher": {
       "name": null,
       "domain": "fox5atlanta.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-50337688a69da721"
      ],
      "temporal": {
       "publishedAt": "2023-05-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Then-commissioner Mikita Browning announces that new 'smart' meters will replace existing technology so that usage and leaks can be read remotely; a council member recalls meters installed the wrong way in the previous wholesale replacement; replacing all meters estimated to take a minimum of three years.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-611fb29d6bdeb05f",
      "title": "Atlanta City Auditor — Performance Audit: Water Billing and Collections (December 2023)",
      "url": "https://www.atlaudit.org/water-billing--collections---december-2023.html",
      "publisher": {
       "name": null,
       "domain": "atlaudit.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3b1d939ba6a16ddc",
       "clm-8a84392b7951e6ea",
       "clm-dd4fc7e717b61103"
      ],
      "temporal": {
       "publishedAt": "2023-12-07",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "City Auditor's performance audit: the monthly bill estimation rate rose from a median of about 3.6% in 2020 to 8.75% as of May 2023 (15,047 of 170,798 accounts, 8.81%, estimated in May 2023) against an AWWA benchmark median of 0.1%; likely causes are insufficient field staff and a backlog of meter investigation and repair work orders; management replies that it is piloting replacement of faulty meters with new technology, expanding citywide over time, with an estimated implementation date of December 2029.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-42c1700b964b238e",
      "title": "Atlanta City Auditor — Water Billing and Collections Follow-Up (August 2026)",
      "url": "https://www.atlaudit.org/department-of-watershed-management-water-billing-and-collections-follow-up---august-2026.html",
      "publisher": {
       "name": null,
       "domain": "atlaudit.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-af97bb2099468a40",
       "clm-efff4c3d8a222664",
       "clm-701320c6fc21003b"
      ],
      "temporal": {
       "publishedAt": "2026-08-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Follow-up audit on collections: delinquent balance grew from $198 million to $236 million on 60,168 accounts by April 2026; the department billed over 177,000 active accounts in April 2026; readings come from automated meters or manually when they fail; the department says it is addressing the 2023 recommendations but has not reported progress toward implementing them.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-c82e1edab35caea0",
      "title": "Atlanta City Auditor — Water Meter Reading, Estimates and Adjusted Billings (May 2013)",
      "url": "https://www.atlaudit.org/water-meter-readings-estimates-and-adjusted-billings-may-2013.html",
      "publisher": {
       "name": null,
       "domain": "atlaudit.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-5f268ebc0ff148b8",
       "clm-4cb9221f8402e208",
       "clm-5324435e13b0c379",
       "clm-dd4fc7e717b61103"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Earlier audit: automated meter reading, installed from 2006, accounted for 96% of bills in the first half of 2012; estimated and forced reads were 1%, down from 10% in 2008 and 2009; disputes and meter-check requests stayed fairly stable; the department's own evaluation found only one-third of small meters met all standards.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-18ecf64a8aa609de",
      "title": "WSB-TV — City addresses thousands of late water accounts (30 Sep 2026)",
      "url": "https://www.wsbtv.com/news/local/city-addresses-thousands-late-water-accounts/27B5FTFSV5FC7JRSUVT4SD45HY/",
      "publisher": {
       "name": null,
       "domain": "wsbtv.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c42db7f9e86d7c05"
      ],
      "temporal": {
       "publishedAt": "2026-09-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports the department's collections push after the 2026 audit and closes: long-term plans call for transitioning the city water network to automated smart meters that record real-time usage and detect leaks immediately.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f4fa5f23b4350f17",
      "title": "GPB News — Atlanta mayor announces 20-year plan to repair and replace city's water infrastructure",
      "url": "https://www.gpb.org/news/2025/03/20/atlanta-mayor-announces-20-year-plan-repair-and-replace-citys-water-infrastructure",
      "publisher": {
       "name": null,
       "domain": "gpb.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d2e2bb2e5fdb54f3"
      ],
      "temporal": {
       "publishedAt": "2025-03-20",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-11",
       "dossierCreatedAt": "2026-10-13",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Mayor Dickens commits an estimated $2 billion over 20 years to replace pipes and other water assets, the Atlanta Drinking Water Renewal and Replacement Program; the article does not mention meters.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 14,
     "claimsMapped": 14,
     "sourcesTotal": 7,
     "sourcesUsedByClaims": 7,
     "sourcesWithPublicationDate": 6,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}
