 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "addis-ababa-light-rail-transit",
  "title": "Addis Ababa Light Rail Transit",
  "canonicalUrl": "https://1001smartcities.org/projects/addis-ababa-light-rail-transit/"
 },
 "currentRevisionId": "2026-08-27-editorial-review-2",
 "revisions": [
  {
   "id": "2026-08-20-source-dates",
   "createdAt": "2026-08-20T19:03:10Z",
   "effectiveAt": "2026-08-07",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 1 claim and 8 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:e54c88887b6ea6d7babdf9ea0b0a0755c16408fcadc1e80a65afaf3edae39fa0",
   "snapshot": {
    "asOf": "2026-08-07",
    "projectFingerprint": "sha256:5c8aaadd0dfc3099d26e064a6794a48d93e225bc65a5d73b8bc93be3fb270ac7",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2015,
      "ended": null
     }
    },
    "governance": {
     "operator": "Ethiopian Railways Corporation (ERC), with technical operations run jointly with Shenzhen Metro Group",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "public",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-614b44b62845e62a",
      "field": "impact",
      "text": "Daily ridership of roughly 45,000-56,000 remains far under the 2016 peak near 113,500",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-7587a663f34404a4"
      ],
      "supportNote": "The May 2026 assessment puts ridership at about 55,000 a day with roughly a third of the 41 trains operational — far below the line's early peak.",
      "caveat": "The 2016 peak figure and the range's lower bound come from other sources in this entry; operator statements have run above press counts.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-3fd24de09472b1b1",
      "title": "Ethiopian Railways Corporation (ERC) — official operator/regulator page",
      "url": "https://erc.gov.et/service/addis-ababa-light-rail-transport/",
      "publisher": {
       "name": null,
       "domain": "erc.gov.et",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Official page describing the line and ERC's role; returned an intermittent 503 during research, re-check before publishing",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-9ed9f5a1a8ddec83",
      "title": "Wikipedia — Addis Ababa Light Rail",
      "url": "https://en.wikipedia.org/wiki/Addis_Ababa_Light_Rail",
      "publisher": {
       "name": null,
       "domain": "en.wikipedia.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Opening dates, length/stations, builder/financier, fleet and ridership figures; describes it as the first light rail/rapid transit in East and sub-Saharan Africa",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-194ee29a3f38f959",
      "title": "Semafor — 'Ethiopia's China Addis Ababa rail collapse $60m problem' (Feb 2023)",
      "url": "https://www.semafor.com/article/02/02/2023/ethiopias-china-addis-ababa-rail-collapse-60m-problem",
      "publisher": {
       "name": null,
       "domain": "semafor.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2023-02-02",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent reporting on the spare-parts/financing crisis, only 8 of 41 trains running as of Feb 2023",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-87950770fefa6492",
      "title": "South China Morning Post — China's continued technical support amid decline",
      "url": "https://www.scmp.com/news/china/diplomacy/article/3210425/china-hands-lifeline-ethiopian-capitals-crumbling-light-rail",
      "publisher": {
       "name": null,
       "domain": "scmp.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2023-02-17",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent press on continued Chinese technical support amid operational decline, incl. a $23m spare-parts agreement covering seven more trains",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-7587a663f34404a4",
      "title": "Amb. David H. Shinn blog — assessment of the project (May 2026)",
      "url": "http://davidshinn.blogspot.com/2026/05/assessment-of-chinese-financed-and.html",
      "publisher": {
       "name": null,
       "domain": "davidshinn.blogspot.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-614b44b62845e62a"
      ],
      "temporal": {
       "publishedAt": "2014-01-13",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Quotes: 'only about a third of its 41 trains are operational'; ridership 'just 55,000 passengers a day'; project 'fell far short of its promises' and added new traffic bottlenecks rather than easing them",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-0760fa8836d6d194",
      "title": "Addis Ababa Light Rail Transit Signaling System Design Analysis (AAU thesis repository)",
      "url": "https://etd.aau.edu.et/items/c77a7114-4177-4303-a05c-d9f61ab24750",
      "publisher": {
       "name": null,
       "domain": "etd.aau.edu.et",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Engineering-level description of the line's signal/grade-crossing protection system",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-8eb53926bb341642",
      "title": "FSX Business — 'Addis Ababa Light Rail Sees Passenger Surge to 75,000 as Fuel Shortage Bites' (28 Apr 2026)",
      "url": "https://www.fsxbusiness.com/addis-ababa-light-rail-sees-passenger-surge",
      "publisher": {
       "name": null,
       "domain": "fsxbusiness.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator-sourced: 17 of 41 trains in service, ridership surged from a baseline ~45,000 to ~75,000 amid a fuel shortage; CEO cites plans to return two more trains and couple trains at peak",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-35eaabe8781be1e2",
      "title": "2merkato (citing Ethiopian Herald/ERC) — 'Addis Ababa Light Rail Expands Fleet and Boosts Performance' (6 Aug 2025)",
      "url": "https://www.2merkato.com/news/transport/8570-ethiopia-addis-ababa-light-rail-expands-fleet-and-boosts-performance-amid-infrastructure-improvements",
      "publisher": {
       "name": null,
       "domain": "2merkato.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2025-08-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trägt die Betreiberangabe: 19 von 41 Zügen instandgesetzt zum Ende des äthiopischen Fiskaljahrs 2025, Ziel 25 für 2026, 16,5 Mio. Jahresfahrgäste — als operator claim gekennzeichnet.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 1,
     "claimsMapped": 1,
     "sourcesTotal": 8,
     "sourcesUsedByClaims": 1,
     "sourcesWithPublicationDate": 4,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-26-claim-mapping",
   "createdAt": "2026-08-26T12:00:00Z",
   "effectiveAt": "2026-08-07",
   "changeType": "update",
   "summary": "Added a ten-claim evidence mapping and a sourced lesson; corrected the date of the independent 2026 assessment from 2014-01-13 to its actual posting date of 2026-05-12 and named the peer-reviewed study it summarises; restated ridership and fleet figures as the operator's own, with the independent count beside them; rewrote a source note that had been left in German.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/claims",
     "summary": "Updated claims to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:771bd3233985f2da7b8551fa0681ab74df9a6ebeb2d7ec268134cffb155d16c0",
   "snapshot": {
    "asOf": "2026-08-07",
    "projectFingerprint": "sha256:85e50deb3160ba1234a1cee86ba3ad2834fdfeb7eab64927711146d89a386cd6",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2015,
      "ended": null
     }
    },
    "governance": {
     "operator": "Ethiopian Railways Corporation (ERC), with technical operations run jointly with Shenzhen Metro Group",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "public",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-b820dda697cf7e78",
      "field": "snippet",
      "text": "Opened in 2015 as sub-Saharan Africa's first modern urban light rail, the 31.6 km, 39-station, two-line network was built by China Railway Group and financed by a roughly $475 million loan from China's Export-Import Bank",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-9ed9f5a1a8ddec83",
       "src-7587a663f34404a4"
      ],
      "supportNote": "The encyclopaedia entry carries the opening year, length, station count, builder and financier; the 2026 assessment independently gives the $475 million Chinese loan.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3faa15a6e8fc8acd",
      "field": "snippet",
      "text": "The line uses fixed-block signalling with track circuits and level-crossing protection engineered specifically for it",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0760fa8836d6d194"
      ],
      "supportNote": "The Addis Ababa University thesis analyses the line's signalling and grade-crossing protection design.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-127e92dfda4eaab5",
      "field": "snippet",
      "text": "a rehabilitation push begun in 2024 has been returning trains a handful at a time",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-35eaabe8781be1e2",
       "src-8eb53926bb341642"
      ],
      "supportNote": "The operator reports the working fleet rising from 13 to 19 by the end of the 2025 fiscal year; the April 2026 report counts 17 in service.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9016a94668b8220b",
      "field": "impact",
      "text": "Daily ridership runs between about 45,000 and 60,000 on the operator's own figures, against a 2016 peak near 113,500",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8eb53926bb341642",
       "src-35eaabe8781be1e2",
       "src-9ed9f5a1a8ddec83"
      ],
      "supportNote": "The operator gives a daily baseline of about 45,000 in April 2026 and about 60,000 in August 2025; the early peak figure comes from the encyclopaedia entry.",
      "caveat": "Both ends of the range are operator statements; the independent 2026 assessment puts ridership at about 55,000 a day.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-fdd4df88762e1a48",
      "field": "impact",
      "text": "a fuel shortage in April 2026 briefly pushed it to about 75,000 as commuters left road transport",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8eb53926bb341642"
      ],
      "supportNote": "The April 2026 report attributes the rise to a fuel shortage driving commuters away from road transport.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-4e89e71df87dbed9",
      "field": "impact",
      "text": "Only 17 of the 41 trains were in service in April 2026, up from eight in February 2023",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8eb53926bb341642",
       "src-194ee29a3f38f959"
      ],
      "supportNote": "The April 2026 report counts 17 of 41 in service; the February 2023 report counted eight.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f65194c6147b4550",
      "field": "lesson",
      "text": "By February 2023 eight of the 41 trains were running",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-194ee29a3f38f959"
      ],
      "supportNote": "Semafor reports the Addis Ababa Road and Transport Bureau's count of eight operational trains out of 41.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-594ff9aa3cb1fff8",
      "field": "lesson",
      "text": "spare parts, motors, and the foreign exchange to import them",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-194ee29a3f38f959"
      ],
      "supportNote": "The bureau is quoted saying the line lacks spare parts as well as the foreign exchange needed to import them.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-18c72dbd62633afd",
      "field": "lesson",
      "text": "The rescue was another Chinese agreement, for 573 types of spare part worth $23 million",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-87950770fefa6492"
      ],
      "supportNote": "The February 2023 report describes the agreement covering 573 types of spare part worth 155 million yuan, about $23 million.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c1a219ade4d433c8",
      "field": "lesson",
      "text": "the independent assessment published in 2026, which put working trains at about a third of the fleet and ridership at 55,000 a day",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-7587a663f34404a4"
      ],
      "supportNote": "The May 2026 post reports the assessment's conclusion that only about a third of the 41 trains are operational, carrying about 55,000 passengers a day.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-3fd24de09472b1b1",
      "title": "Ethiopian Railways Corporation (ERC) — official operator/regulator page",
      "url": "https://erc.gov.et/service/addis-ababa-light-rail-transport/",
      "publisher": {
       "name": null,
       "domain": "erc.gov.et",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Official page describing the line and ERC's role; returned an intermittent 503 during research, re-check before publishing",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-9ed9f5a1a8ddec83",
      "title": "Wikipedia — Addis Ababa Light Rail",
      "url": "https://en.wikipedia.org/wiki/Addis_Ababa_Light_Rail",
      "publisher": {
       "name": null,
       "domain": "en.wikipedia.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b820dda697cf7e78",
       "clm-9016a94668b8220b"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Opening dates, length/stations, builder/financier, fleet and ridership figures; describes it as the first light rail/rapid transit in East and sub-Saharan Africa",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-194ee29a3f38f959",
      "title": "Semafor — 'Ethiopia's China Addis Ababa rail collapse $60m problem' (Feb 2023)",
      "url": "https://www.semafor.com/article/02/02/2023/ethiopias-china-addis-ababa-rail-collapse-60m-problem",
      "publisher": {
       "name": null,
       "domain": "semafor.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-4e89e71df87dbed9",
       "clm-f65194c6147b4550",
       "clm-594ff9aa3cb1fff8"
      ],
      "temporal": {
       "publishedAt": "2023-02-02",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent reporting on the spare-parts/financing crisis, only 8 of 41 trains running as of Feb 2023",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-87950770fefa6492",
      "title": "South China Morning Post — China's continued technical support amid decline",
      "url": "https://www.scmp.com/news/china/diplomacy/article/3210425/china-hands-lifeline-ethiopian-capitals-crumbling-light-rail",
      "publisher": {
       "name": null,
       "domain": "scmp.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-18c72dbd62633afd"
      ],
      "temporal": {
       "publishedAt": "2023-02-17",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent press on continued Chinese technical support amid operational decline, incl. a $23m spare-parts agreement covering seven more trains",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-7587a663f34404a4",
      "title": "Amb. David H. Shinn blog — assessment of the project (May 2026)",
      "url": "http://davidshinn.blogspot.com/2026/05/assessment-of-chinese-financed-and.html",
      "publisher": {
       "name": null,
       "domain": "davidshinn.blogspot.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b820dda697cf7e78",
       "clm-c1a219ade4d433c8"
      ],
      "temporal": {
       "publishedAt": "2026-05-12",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Post of 12 May 2026 summarising a peer-reviewed assessment published in Transportation Research Interdisciplinary Perspectives in March 2026 by Guibo Sun (University of Manchester) and Kristen Zhao (Manchester Metropolitan University), DOI 10.1016/j.trip.2025.101827. Quotes: 'only about a third of its 41 trains are operational'; ridership 'just 55,000 passengers a day'; the project 'fell far short of its promises'. The underlying paper is behind an Elsevier block from here, so it is cited as the blog reports it, not read directly.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-0760fa8836d6d194",
      "title": "Addis Ababa Light Rail Transit Signaling System Design Analysis (AAU thesis repository)",
      "url": "https://etd.aau.edu.et/items/c77a7114-4177-4303-a05c-d9f61ab24750",
      "publisher": {
       "name": null,
       "domain": "etd.aau.edu.et",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3faa15a6e8fc8acd"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Engineering-level description of the line's signal/grade-crossing protection system",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-8eb53926bb341642",
      "title": "FSX Business — 'Addis Ababa Light Rail Sees Passenger Surge to 75,000 as Fuel Shortage Bites' (28 Apr 2026)",
      "url": "https://www.fsxbusiness.com/addis-ababa-light-rail-sees-passenger-surge",
      "publisher": {
       "name": null,
       "domain": "fsxbusiness.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-127e92dfda4eaab5",
       "clm-9016a94668b8220b",
       "clm-fdd4df88762e1a48",
       "clm-4e89e71df87dbed9"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator-sourced: 17 of 41 trains in service, ridership surged from a baseline ~45,000 to ~75,000 amid a fuel shortage; CEO cites plans to return two more trains and couple trains at peak",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-35eaabe8781be1e2",
      "title": "2merkato (citing Ethiopian Herald/ERC) — 'Addis Ababa Light Rail Expands Fleet and Boosts Performance' (6 Aug 2025)",
      "url": "https://www.2merkato.com/news/transport/8570-ethiopia-addis-ababa-light-rail-expands-fleet-and-boosts-performance-amid-infrastructure-improvements",
      "publisher": {
       "name": null,
       "domain": "2merkato.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-127e92dfda4eaab5",
       "clm-9016a94668b8220b"
      ],
      "temporal": {
       "publishedAt": "2025-08-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Carries the operator's own claim: 19 of 41 trains restored by the end of the 2025 Ethiopian fiscal year, a target of 25 for 2026, 16.5 million annual passengers and about 60,000 a day — marked as an operator claim, not an independent count.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 8,
     "sourcesUsedByClaims": 7,
     "sourcesWithPublicationDate": 4,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-27-editorial-review",
   "createdAt": "2026-08-27T13:46:00Z",
   "effectiveAt": "2026-08-07",
   "changeType": "correction",
   "summary": "Name the peer-reviewed assessment the cited blog summarises, and lower the evidence grade to what actually carries the entry.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/projectState",
     "summary": "Updated projectState to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/claims",
     "summary": "Updated claims to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:68f5faa44bc69cb18d37fd2dbc8e20d1b8ef4366da58895bf5c9594b0392522a",
   "snapshot": {
    "asOf": "2026-08-07",
    "projectFingerprint": "sha256:4026aa28cf842d03335016e91b1279f1d484fe4bfcded33e16969a2abaa9e042",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "media",
     "timeline": {
      "started": 2015,
      "ended": null
     }
    },
    "governance": {
     "operator": "Ethiopian Railways Corporation (ERC), with technical operations run jointly with Shenzhen Metro Group",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "public",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-b820dda697cf7e78",
      "field": "snippet",
      "text": "Opened in 2015 as sub-Saharan Africa's first modern urban light rail, the 31.6 km, 39-station, two-line network was built by China Railway Group and financed by a roughly $475 million loan from China's Export-Import Bank",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-9ed9f5a1a8ddec83",
       "src-7587a663f34404a4"
      ],
      "supportNote": "The encyclopaedia entry carries the opening year, length, station count, builder and financier; the 2026 assessment independently gives the $475 million Chinese loan.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3faa15a6e8fc8acd",
      "field": "snippet",
      "text": "The line uses fixed-block signalling with track circuits and level-crossing protection engineered specifically for it",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0760fa8836d6d194"
      ],
      "supportNote": "The Addis Ababa University thesis analyses the line's signalling and grade-crossing protection design.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-127e92dfda4eaab5",
      "field": "snippet",
      "text": "a rehabilitation push begun in 2024 has been returning trains a handful at a time",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-35eaabe8781be1e2",
       "src-8eb53926bb341642"
      ],
      "supportNote": "The operator reports the working fleet rising from 13 to 19 by the end of the 2025 fiscal year; the April 2026 report counts 17 in service.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9016a94668b8220b",
      "field": "impact",
      "text": "Daily ridership runs between about 45,000 and 60,000 on the operator's own figures, against a 2016 peak near 113,500",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8eb53926bb341642",
       "src-35eaabe8781be1e2",
       "src-9ed9f5a1a8ddec83"
      ],
      "supportNote": "The operator gives a daily baseline of about 45,000 in April 2026 and about 60,000 in August 2025; the early peak figure comes from the encyclopaedia entry.",
      "caveat": "Both ends of the range are operator statements; the independent 2026 assessment puts ridership at about 55,000 a day.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-fdd4df88762e1a48",
      "field": "impact",
      "text": "a fuel shortage in April 2026 briefly pushed it to about 75,000 as commuters left road transport",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8eb53926bb341642"
      ],
      "supportNote": "The April 2026 report attributes the rise to a fuel shortage driving commuters away from road transport.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-4e89e71df87dbed9",
      "field": "impact",
      "text": "Only 17 of the 41 trains were in service in April 2026, up from eight in February 2023",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8eb53926bb341642",
       "src-194ee29a3f38f959"
      ],
      "supportNote": "The April 2026 report counts 17 of 41 in service; the February 2023 report counted eight.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f65194c6147b4550",
      "field": "lesson",
      "text": "By February 2023 eight of the 41 trains were running",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-194ee29a3f38f959"
      ],
      "supportNote": "Semafor reports the Addis Ababa Road and Transport Bureau's count of eight operational trains out of 41.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-594ff9aa3cb1fff8",
      "field": "lesson",
      "text": "spare parts, motors, and the foreign exchange to import them",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-194ee29a3f38f959"
      ],
      "supportNote": "The bureau is quoted saying the line lacks spare parts as well as the foreign exchange needed to import them.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-18c72dbd62633afd",
      "field": "lesson",
      "text": "The rescue was another Chinese agreement, for 573 types of spare part worth $23 million",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-87950770fefa6492"
      ],
      "supportNote": "The February 2023 report describes the agreement covering 573 types of spare part worth 155 million yuan, about $23 million.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b7cf217246525203",
      "field": "lesson",
      "text": "the peer-reviewed assessment published in March 2026, which put working trains at about a third of the fleet and ridership at 55,000 a day",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-7587a663f34404a4"
      ],
      "supportNote": "The May 2026 post reports the assessment's conclusion that only about a third of the 41 trains are operational, carrying about 55,000 passengers a day.",
      "caveat": "The assessment is peer-reviewed, but this entry read its conclusions in a secondary summary rather than in the article, which is behind a verification wall.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-3fd24de09472b1b1",
      "title": "Ethiopian Railways Corporation (ERC) — official operator/regulator page",
      "url": "https://erc.gov.et/service/addis-ababa-light-rail-transport/",
      "publisher": {
       "name": null,
       "domain": "erc.gov.et",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Official page describing the line and ERC's role; returned an intermittent 503 during research, re-check before publishing",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-9ed9f5a1a8ddec83",
      "title": "Wikipedia — Addis Ababa Light Rail",
      "url": "https://en.wikipedia.org/wiki/Addis_Ababa_Light_Rail",
      "publisher": {
       "name": null,
       "domain": "en.wikipedia.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b820dda697cf7e78",
       "clm-9016a94668b8220b"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Opening dates, length/stations, builder/financier, fleet and ridership figures; describes it as the first light rail/rapid transit in East and sub-Saharan Africa",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-194ee29a3f38f959",
      "title": "Semafor — 'Ethiopia's China Addis Ababa rail collapse $60m problem' (Feb 2023)",
      "url": "https://www.semafor.com/article/02/02/2023/ethiopias-china-addis-ababa-rail-collapse-60m-problem",
      "publisher": {
       "name": null,
       "domain": "semafor.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-4e89e71df87dbed9",
       "clm-f65194c6147b4550",
       "clm-594ff9aa3cb1fff8"
      ],
      "temporal": {
       "publishedAt": "2023-02-02",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent reporting on the spare-parts/financing crisis, only 8 of 41 trains running as of Feb 2023",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-87950770fefa6492",
      "title": "South China Morning Post — China's continued technical support amid decline",
      "url": "https://www.scmp.com/news/china/diplomacy/article/3210425/china-hands-lifeline-ethiopian-capitals-crumbling-light-rail",
      "publisher": {
       "name": null,
       "domain": "scmp.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-18c72dbd62633afd"
      ],
      "temporal": {
       "publishedAt": "2023-02-17",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent press on continued Chinese technical support amid operational decline, incl. a $23m spare-parts agreement covering seven more trains",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-7587a663f34404a4",
      "title": "Amb. David H. Shinn blog, 12 May 2026 — summary of Sun & Zhao, Transportation Research Interdisciplinary Perspectives 36 (March 2026)",
      "url": "http://davidshinn.blogspot.com/2026/05/assessment-of-chinese-financed-and.html",
      "publisher": {
       "name": null,
       "domain": "davidshinn.blogspot.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b820dda697cf7e78",
       "clm-b7cf217246525203"
      ],
      "temporal": {
       "publishedAt": "2026-05-12",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "A former US ambassador's blog post of 12 May 2026 summarising 'The road divides: When funding shapes form - Assessing the connectivity impacts of China-financed light rail in Addis Ababa' by Guibo Sun (University of Manchester) and Kristen Zhao (Manchester Metropolitan University), published in Transportation Research Interdisciplinary Perspectives volume 36, March 2026. The figures this entry takes from it are the blog's rendering of that assessment; the article itself is behind a verification wall and was not read here.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-0760fa8836d6d194",
      "title": "Addis Ababa Light Rail Transit Signaling System Design Analysis (AAU thesis repository)",
      "url": "https://etd.aau.edu.et/items/c77a7114-4177-4303-a05c-d9f61ab24750",
      "publisher": {
       "name": null,
       "domain": "etd.aau.edu.et",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3faa15a6e8fc8acd"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Engineering-level description of the line's signal/grade-crossing protection system",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-8eb53926bb341642",
      "title": "FSX Business — 'Addis Ababa Light Rail Sees Passenger Surge to 75,000 as Fuel Shortage Bites' (28 Apr 2026)",
      "url": "https://www.fsxbusiness.com/addis-ababa-light-rail-sees-passenger-surge",
      "publisher": {
       "name": null,
       "domain": "fsxbusiness.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-127e92dfda4eaab5",
       "clm-9016a94668b8220b",
       "clm-fdd4df88762e1a48",
       "clm-4e89e71df87dbed9"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator-sourced: 17 of 41 trains in service, ridership surged from a baseline ~45,000 to ~75,000 amid a fuel shortage; CEO cites plans to return two more trains and couple trains at peak",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-35eaabe8781be1e2",
      "title": "2merkato (citing Ethiopian Herald/ERC) — 'Addis Ababa Light Rail Expands Fleet and Boosts Performance' (6 Aug 2025)",
      "url": "https://www.2merkato.com/news/transport/8570-ethiopia-addis-ababa-light-rail-expands-fleet-and-boosts-performance-amid-infrastructure-improvements",
      "publisher": {
       "name": null,
       "domain": "2merkato.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-127e92dfda4eaab5",
       "clm-9016a94668b8220b"
      ],
      "temporal": {
       "publishedAt": "2025-08-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Carries the operator's own claim: 19 of 41 trains restored by the end of the 2025 Ethiopian fiscal year, a target of 25 for 2026, 16.5 million annual passengers and about 60,000 a day — marked as an operator claim, not an independent count.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 8,
     "sourcesUsedByClaims": 7,
     "sourcesWithPublicationDate": 4,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-27-editorial-review-2",
   "createdAt": "2026-08-27T13:54:00Z",
   "effectiveAt": "2026-08-07",
   "changeType": "correction",
   "summary": "Rewrite a source note that told the reader how the page answered a request instead of what it carries.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:1e6280b52aa43a75f4cede7ef08a17bd99004bdafd49d4126eeebd3cac557493",
   "snapshot": {
    "asOf": "2026-08-07",
    "projectFingerprint": "sha256:a9cfd27326b9a57ded97cda2cb568863b30616057ce010a222a66d68c0170b7e",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "media",
     "timeline": {
      "started": 2015,
      "ended": null
     }
    },
    "governance": {
     "operator": "Ethiopian Railways Corporation (ERC), with technical operations run jointly with Shenzhen Metro Group",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "public",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-b820dda697cf7e78",
      "field": "snippet",
      "text": "Opened in 2015 as sub-Saharan Africa's first modern urban light rail, the 31.6 km, 39-station, two-line network was built by China Railway Group and financed by a roughly $475 million loan from China's Export-Import Bank",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-9ed9f5a1a8ddec83",
       "src-7587a663f34404a4"
      ],
      "supportNote": "The encyclopaedia entry carries the opening year, length, station count, builder and financier; the 2026 assessment independently gives the $475 million Chinese loan.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3faa15a6e8fc8acd",
      "field": "snippet",
      "text": "The line uses fixed-block signalling with track circuits and level-crossing protection engineered specifically for it",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0760fa8836d6d194"
      ],
      "supportNote": "The Addis Ababa University thesis analyses the line's signalling and grade-crossing protection design.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-127e92dfda4eaab5",
      "field": "snippet",
      "text": "a rehabilitation push begun in 2024 has been returning trains a handful at a time",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-35eaabe8781be1e2",
       "src-8eb53926bb341642"
      ],
      "supportNote": "The operator reports the working fleet rising from 13 to 19 by the end of the 2025 fiscal year; the April 2026 report counts 17 in service.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9016a94668b8220b",
      "field": "impact",
      "text": "Daily ridership runs between about 45,000 and 60,000 on the operator's own figures, against a 2016 peak near 113,500",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8eb53926bb341642",
       "src-35eaabe8781be1e2",
       "src-9ed9f5a1a8ddec83"
      ],
      "supportNote": "The operator gives a daily baseline of about 45,000 in April 2026 and about 60,000 in August 2025; the early peak figure comes from the encyclopaedia entry.",
      "caveat": "Both ends of the range are operator statements; the independent 2026 assessment puts ridership at about 55,000 a day.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-fdd4df88762e1a48",
      "field": "impact",
      "text": "a fuel shortage in April 2026 briefly pushed it to about 75,000 as commuters left road transport",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8eb53926bb341642"
      ],
      "supportNote": "The April 2026 report attributes the rise to a fuel shortage driving commuters away from road transport.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-4e89e71df87dbed9",
      "field": "impact",
      "text": "Only 17 of the 41 trains were in service in April 2026, up from eight in February 2023",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8eb53926bb341642",
       "src-194ee29a3f38f959"
      ],
      "supportNote": "The April 2026 report counts 17 of 41 in service; the February 2023 report counted eight.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f65194c6147b4550",
      "field": "lesson",
      "text": "By February 2023 eight of the 41 trains were running",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-194ee29a3f38f959"
      ],
      "supportNote": "Semafor reports the Addis Ababa Road and Transport Bureau's count of eight operational trains out of 41.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-594ff9aa3cb1fff8",
      "field": "lesson",
      "text": "spare parts, motors, and the foreign exchange to import them",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-194ee29a3f38f959"
      ],
      "supportNote": "The bureau is quoted saying the line lacks spare parts as well as the foreign exchange needed to import them.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-18c72dbd62633afd",
      "field": "lesson",
      "text": "The rescue was another Chinese agreement, for 573 types of spare part worth $23 million",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-87950770fefa6492"
      ],
      "supportNote": "The February 2023 report describes the agreement covering 573 types of spare part worth 155 million yuan, about $23 million.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b7cf217246525203",
      "field": "lesson",
      "text": "the peer-reviewed assessment published in March 2026, which put working trains at about a third of the fleet and ridership at 55,000 a day",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-7587a663f34404a4"
      ],
      "supportNote": "The May 2026 post reports the assessment's conclusion that only about a third of the 41 trains are operational, carrying about 55,000 passengers a day.",
      "caveat": "The assessment is peer-reviewed, but this entry read its conclusions in a secondary summary rather than in the article, which is behind a verification wall.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-3fd24de09472b1b1",
      "title": "Ethiopian Railways Corporation (ERC) — official operator/regulator page",
      "url": "https://erc.gov.et/service/addis-ababa-light-rail-transport/",
      "publisher": {
       "name": null,
       "domain": "erc.gov.et",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The operator's own page describing the line and its role in running it. No claim on this entry rests on it, and no publication date is recorded for the page.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-9ed9f5a1a8ddec83",
      "title": "Wikipedia — Addis Ababa Light Rail",
      "url": "https://en.wikipedia.org/wiki/Addis_Ababa_Light_Rail",
      "publisher": {
       "name": null,
       "domain": "en.wikipedia.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b820dda697cf7e78",
       "clm-9016a94668b8220b"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Opening dates, length/stations, builder/financier, fleet and ridership figures; describes it as the first light rail/rapid transit in East and sub-Saharan Africa",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-194ee29a3f38f959",
      "title": "Semafor — 'Ethiopia's China Addis Ababa rail collapse $60m problem' (Feb 2023)",
      "url": "https://www.semafor.com/article/02/02/2023/ethiopias-china-addis-ababa-rail-collapse-60m-problem",
      "publisher": {
       "name": null,
       "domain": "semafor.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-4e89e71df87dbed9",
       "clm-f65194c6147b4550",
       "clm-594ff9aa3cb1fff8"
      ],
      "temporal": {
       "publishedAt": "2023-02-02",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent reporting on the spare-parts/financing crisis, only 8 of 41 trains running as of Feb 2023",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-87950770fefa6492",
      "title": "South China Morning Post — China's continued technical support amid decline",
      "url": "https://www.scmp.com/news/china/diplomacy/article/3210425/china-hands-lifeline-ethiopian-capitals-crumbling-light-rail",
      "publisher": {
       "name": null,
       "domain": "scmp.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-18c72dbd62633afd"
      ],
      "temporal": {
       "publishedAt": "2023-02-17",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent press on continued Chinese technical support amid operational decline, incl. a $23m spare-parts agreement covering seven more trains",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-7587a663f34404a4",
      "title": "Amb. David H. Shinn blog, 12 May 2026 — summary of Sun & Zhao, Transportation Research Interdisciplinary Perspectives 36 (March 2026)",
      "url": "http://davidshinn.blogspot.com/2026/05/assessment-of-chinese-financed-and.html",
      "publisher": {
       "name": null,
       "domain": "davidshinn.blogspot.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b820dda697cf7e78",
       "clm-b7cf217246525203"
      ],
      "temporal": {
       "publishedAt": "2026-05-12",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "A former US ambassador's blog post of 12 May 2026 summarising 'The road divides: When funding shapes form - Assessing the connectivity impacts of China-financed light rail in Addis Ababa' by Guibo Sun (University of Manchester) and Kristen Zhao (Manchester Metropolitan University), published in Transportation Research Interdisciplinary Perspectives volume 36, March 2026. The figures this entry takes from it are the blog's rendering of that assessment; the article itself is behind a verification wall and was not read here.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-0760fa8836d6d194",
      "title": "Addis Ababa Light Rail Transit Signaling System Design Analysis (AAU thesis repository)",
      "url": "https://etd.aau.edu.et/items/c77a7114-4177-4303-a05c-d9f61ab24750",
      "publisher": {
       "name": null,
       "domain": "etd.aau.edu.et",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3faa15a6e8fc8acd"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Engineering-level description of the line's signal/grade-crossing protection system",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-8eb53926bb341642",
      "title": "FSX Business — 'Addis Ababa Light Rail Sees Passenger Surge to 75,000 as Fuel Shortage Bites' (28 Apr 2026)",
      "url": "https://www.fsxbusiness.com/addis-ababa-light-rail-sees-passenger-surge",
      "publisher": {
       "name": null,
       "domain": "fsxbusiness.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-127e92dfda4eaab5",
       "clm-9016a94668b8220b",
       "clm-fdd4df88762e1a48",
       "clm-4e89e71df87dbed9"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator-sourced: 17 of 41 trains in service, ridership surged from a baseline ~45,000 to ~75,000 amid a fuel shortage; CEO cites plans to return two more trains and couple trains at peak",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-35eaabe8781be1e2",
      "title": "2merkato (citing Ethiopian Herald/ERC) — 'Addis Ababa Light Rail Expands Fleet and Boosts Performance' (6 Aug 2025)",
      "url": "https://www.2merkato.com/news/transport/8570-ethiopia-addis-ababa-light-rail-expands-fleet-and-boosts-performance-amid-infrastructure-improvements",
      "publisher": {
       "name": null,
       "domain": "2merkato.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-127e92dfda4eaab5",
       "clm-9016a94668b8220b"
      ],
      "temporal": {
       "publishedAt": "2025-08-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Carries the operator's own claim: 19 of 41 trains restored by the end of the 2025 Ethiopian fiscal year, a target of 25 for 2026, 16.5 million annual passengers and about 60,000 a day — marked as an operator claim, not an independent count.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 8,
     "sourcesUsedByClaims": 7,
     "sourcesWithPublicationDate": 4,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}